4. Assembly and Installation
4.1
Requirements for the Installation site
The ClimaPac Compact units is designed to be installed on a level foundation (concrete base or steel
beam).
Uneven or insuffi cient foundation or a bad positioning of the unit on the foundation
can lead the unit to overturn.
See foundations requirements for a correct installation.
Risk of explosion.
The unit may be not operated in an explosive atmosphere!
• The base on which the unit is to be installed must be level, fl at and of adequate load-bearing
capacity.
• The whole baseframe of the unit must rest on the base and make full surface contact with it.
• The minimum height of the base must correspond to the siphon height (for siphon calculation see
4.3.2 Connection of drains
).
• In case of using strip foundations, additional cross supports are required at the beginning and end
of the unit, as well as at the joints between unit sections.
• The whole baseframe of the unit must rest on the base and make full surface contact with it.
• In case of using strip foundations, additional cross supports are required at the beginning and end
of the unit, as well as at the joints between unit sections.
• Pad or point contact is not permissible.
• Children, unauthorized persons and animals may not have access to the installation site of the AHU
• Take into account the necessary clearances for the maintenance and the air fl ow (see
4.1.2 Space
requirements for installation, maintenance and operation
).
4.1.1
Structure-borne sound insulation
In order to insulate the supporting structure from the vibrations produced by the unit, it is
recommended to use suitable anti-vibration mounts, such as rubber strip.
Installation on concrete base.
Installation on steel beam.
Unit’s baseframe
Vibration
absorber
Steel beam
Concrete base
Vibration