background image

10

 

© STULZ Tecnivel – all rights reserved

EN/11.2020 Technical data subject to modifications

Air Handlers Units

ClimaPac Series

  

3.3 

Operation limits

Outdoor air:

Lower limit

Upper limit

Temperature

-15ºC

70ºC

Return air:

Lower limit

Upper limit

Temperature

0ºC

70ºC

Water supply

Lower limit

Upper limit

Max. Water pressure

Cooling/ heating coil

5ºC

90ºC

10 bar

Steam humidifier

-

40ºC

10 bar

Evaporative pad

-

25ºC

6 bar

Standar supply voltage*

Voltage

380 - 415V / 3ph / 50Hz; PE

Voltage tolerance

± 10%

Frequency Tolerance

± 1%

*Other supply voltages are available on demand.

Further information on the operation and storage conditions limits is available in the specific manual of 
each component (available on demand).

Содержание ClimaPac

Страница 1: ...ClimaPac Air Handling Unit Installation Operation and Maintenance Manual Reference IOM_ClimaPac Version V2 EN 11 2020 Original instructions...

Страница 2: ...n 12 4 1 2 Space requirements for installation maintenance and operation12 4 2 Positioning and assembly of the unit 14 4 2 1 Positioning of the unit 14 4 2 2 Supplied parts 14 4 2 3 Assembly sequence...

Страница 3: ...onents signs Following signs identify the different components of the unit They are used in this manual and on the proper unit in order every section can be quickly identified Fan Empty section Plate...

Страница 4: ...ith strong electromagnetic fields in rooms with aggressive atmosphere that may attack plastics or cause corrosion especially in atmosphere where zinc is particularly susceptible to corrosion ClimaPac...

Страница 5: ...rder You receive the consignment papers with the delivery of the A C unit The shipment is made ex works in case of shipment damages please assert your claim towards the carrier 2 2 Transport Mortal da...

Страница 6: ...be attached to all eyebolts of the baseframe 2 3 Storage If you put the unit into intermediate storage before the installation the following measures have to be carried out to protect the unit from da...

Страница 7: ...may have a different design or additional information STULZ TECNIVEL SL C Caraba a S N 28925 Alcorc n Madrid SPAIN Tel 34 915 571 130 E mail info stulztecnivel com Producto Product Modelo Model N de...

Страница 8: ...irflow passing through the AHU Inlet air can be 100 fresh air or a mix of outdoor air and recirculated air Front view Double deck In this configuration two separate airflows pass through the unit one...

Страница 9: ...anger and run around coils 4 Fan section In this section air is driven through the AHU by the fan Fans are Plug fan type with AC or EC motor 5 Coil section In this section the air is heated up or cool...

Страница 10: ...ture 0 C 70 C Water supply Lower limit Upper limit Max Water pressure Cooling heating coil 5 C 90 C 10 bar Steam humidifier 40 C 10 bar Evaporative pad 25 C 6 bar Standar supply voltage Voltage 380 41...

Страница 11: ...and make full surface contact with it The minimum height of the base must correspond to the siphon height for siphon calculation see 4 3 2 Connection of drains In case of using strip foundations addi...

Страница 12: ...steel beam Unit s baseframe Vibration absorber Steel beam Concrete base Vibration absorber must be installed according to the instructions of the manufacturer 4 1 2 Space requirements for installation...

Страница 13: ...llation against the wall Installation back to back If no ductwork is connected to the air intake exhaust a sufficient clearance must be left in the air intake area in order to ensure a good air circul...

Страница 14: ...tween 2 modules installed in factory All fixing elements drilled holes are perfectly placed in order all the modules can be fixed together Risk of crushing limbs A defective lifting device can lead to...

Страница 15: ...fixing element of the baseframe and secure it with the M8 nuts Screws nuts Module 1 Module 2 Assembly of baseframe Intermediate baseframe assembly The intermediate baseframe if existing of the double...

Страница 16: ...omponent 4 3 1 Electrical connection Before working with electrical wires make sure they are de energized Electric cables are only to be connected by authorized specialist Before connecting electrical...

Страница 17: ...no connection box is provided on the outside of the unit for wiring cables must be connected directly to the connection box of the component passing them through the cable gland on the unit s panel Ea...

Страница 18: ...drain for emp tying it e g condensate pan To avoid any trouble due to the pressure positive or negative in the sections where there is a drain every water outlet must be provided with a siphon of suf...

Страница 19: ...ans with AC motors are mounted on anti vibration springs To avoid the fan to move during transport and installation 4 transport brackets are used to fix the fan structure to the steel support These br...

Страница 20: ...ondensate water drains must be provided with a siphon see siphon calculation in 4 3 2 Connection of drains and connected to local waste water system If the coil is designed to work with water the use...

Страница 21: ...system Motor must be connected according to the instructions given in the chapter 4 3 1 Electrical connection Wheel without controller of KR serie Heat recovery wheel have a three phases motor 3 x 40...

Страница 22: ...nsport brackets are removed Plug fan AC They are clean without visible damage and no foreign body prevents them to work properly Evaporative humidifiers Previous check Electrical connections pump leve...

Страница 23: ...r to remove any solid particle or contamination Coils are clean without visible damage and no foreign body prevents the good circulation of air Coils are properly connected to the water refrigerant ci...

Страница 24: ...tor corner If the heat recovery wheel is equipped with a KR controller consult the instructions manual for the start up Fans Check that the rotation direction is correct see indication on the fan Chec...

Страница 25: ...power conducting cables to the unit and secure them against being switched on again Check to ensure that they are in the de energized state 6 2 Periodic maintenance Activity Action if requiered Maint...

Страница 26: ...al noise For more information consult the specific fan manual available on request EVAPORATIVE HUMIDIFIER Check suction impulsion circuit for contamination Clean 1 month Check power consumption is low...

Страница 27: ...s after commissioning UNIT HOUSING Check for contamination damage and corrosion Clean and repair 12 months Check for water formation condensation leaks Clean and determination of cause 12 months Check...

Страница 28: ...se protection gloves to avoid injuries caused by sharp edges during maintenance and cleaning process Fins Fins usually made of aluminium being part of the exchanger are particularly delicate and can b...

Страница 29: ...as indicated on the drawing here below 1 vibration sensor towards motor s axis of rotation 2 vibration sensor perpendicular to motor s axis of rotation 1 2 Positionning of the vibration sensors Check...

Страница 30: ...isposed in an appropriate manner and may under no circumstances be introduced in the local waste water system CAUTION Disconnect the unit from the external water circuit by closing the shut off valves...

Страница 31: ...STULZ Tecnivel all rights reserved EN 11 2020 Technical data subject to modifications 31 8 EC declaration of conformity...

Страница 32: ...C Caraba a s n P I Ventorro del Cano 28925 Alcorc n Madrid Spain 34 91 557 11 30 info stulztecnivel com www stulztecnivel com Everywhere From a single Source Tested Quality Expertise service Energy e...

Отзывы: