background image

STUDER INNOTEC

                                                                                                                                      

SI

 

 

User manual 

SI V3.0 E 

 

 

 

Sinewave inverter 

 

 

SI SERIES 

 

User's and Installer's Handbook 

 

 
STUDER INNOTEC 
Rue des Casernes 57 
CH-1950 Sion  
Tel : ++41 (0)27 205 60 80  
Fax: ++41 (0)27 205 60 88

 

[email protected] 
www.studer-innotec.com 

Содержание SI 1212

Страница 1: ...User manual SI V3 0 E Sinewave inverter SI SERIES User s and Installer s Handbook STUDER INNOTEC Rue des Casernes 57 CH 1950 Sion Tel 41 0 27 205 60 80 Fax 41 0 27 205 60 88 info studer innotec com www studer innotec com ...

Страница 2: ...ment procedure 5 CONTROL 5 INDICATORS 5 Green Run LED 3 5 Red Fault LED 2 5 SAFETY 5 INTERNAL FUSE 5 OPTIONS 6 ALARM CONTACT 6 SOLAR CHARGE CONTROLLER 6 LED Charging 11 6 LED Bat 100 10 6 MAINTENANCE 6 LEGISLATION 6 LIMITATION OF LIABILITY 6 CE DECLARATION OF CONFORMITY 6 DESCRIPTION AND WIRING DIAGRAM 7 WIRING DIAGRAM FOR SI 600 800 S SOLAR CHARGE REGULATOR 8 SI PERFORMANCE ERREUR SIGNET NON DEFI...

Страница 3: ...rranty No current or tension generating devices public network generator may be connected to the output of the inverter because this could result in its destruction As for the usage of batteries follow the manufacturer s instructions Important After disconnecting the battery the output tension 230V may still remain for 30 seconds The ventilation of the device should never be obstructed Should the ...

Страница 4: ...ing the polarity in order not to damage the device Check that the connections are fixed correctly Use After connecting the inverter make sure the user devices are correctly plugged in and that there is no possible contact between the Line OUT 6 and a person The working device generates high tensions which could be fatal The inverter can be activated by moving the switch to the Auto position The on...

Страница 5: ...n the following ranges 11 4 V and 16 V in the 12 Volt models 22 8 V and 32 V in the 24 Volt models 45 6 V and 61 V in the 48 Volt models Outside these ranges the inverter is automatically disconnected These values correspond to a no load situation and they are automatically adjusted according to the current of the battery The internal temperature and the maximum power are also submitted to control...

Страница 6: ...on for control Legislation In all cases the assembly and installation must be done by qualified technicians observing the national requirements and rules stipulated You will find complete information about this in the relevant institutions Limitation of liability STUDER INNOTEC cannot control the installation use and maintenance of the inverter Thus we are not responsible for damages costs or loss...

Страница 7: ...STUDER INNOTEC SI User manual SI V3 0 E 7 Description and wiring diagram ...

Страница 8: ...STUDER INNOTEC SI User manual SI V3 0 E Wiring diagram for SI 600 800 S Solar charge regulator ...

Страница 9: ...d together in order to obtain a 3 400V 3 phased grid Connecting 1 Check that the inverters are in OFF position 2 First link together the neutral of all 3 devices by taking care that this connecting point be not further than 1 m from each inverter 3 Link together the battery cables take care to not reverse the polarity The 3 inverters have to be connected together to only one battery bank Commissio...

Страница 10: ...imum power 15 min 1 3 1 6 x Pnom 25 C Maximum power 3 min 1 6 2 x Pnom 25 C Peak power 5s 3 5 x Pnom Asymmetric load Up to 2 x Pnom Cos ϕ 0 1 1 Protections Overload Overheat Short circuit Reverse polarity by internal fuse IP protection index IP 20 complies with DIN 40050 IP 23 with top cover Forced ventilation From 45 C 3 C Overheating protection 75 C 3 C Required battery capacity 5x Pnom Unom rec...

Отзывы: