background image

11

10

Yesterday

Today

Details for PV 1/20

PV production of 

MPPT input

kWh

6.7

67.0

 Voltage

15.2

 A

 Sun today

3.4

 hours

Total Energy 

16.0

 MWh

Saved Fuel
 

3504

 l

Next 3/5

PV input 1/2

Max. power

8 kW

Solar excess

6.45 

kW

34 

A

Friday 17 januar 3:18 PM

T

CAN BMS

RS 485i

T

O

O = not connected

T = connected

O

O

T

Display

Display system

ON/OFF

Warning

on – AC load  

powered 400V ac 

1x – standby, load 

search 

2x – warning/error, 

check nx interface

on – AC source present and working 

1x – AC source waiting for connection 

2x – input limit 

3x – check phase rotation 

4x – warning/error, check nx interface

 

on – AC flex (source) 

present and working 

1x – AC flex (source) 

waiting for connection 

2x – input limit 

3x – check phase rotation 

4x – warning/error, check 

nx interface

 

on – AC flex (load) powered 

400 Vac 

1x – standby, load search 

2x – warning/error, check 

nx interface

on – battery connected 

1x – battery low 

2x – warning/error, check nx interface
State of charge 

0 to 25% / 25 to 50% / 50 to 75% / 75 to 100%
Upper LED (not for lithium)  

on – floating 

1x – bulk 

2x – absorption 

3x – equalization

on – solar PV producing 

1x – night 

2x – no solar production 

since 48h 

3x -  warning/error, 

check nx interface

Communication and power up

1 nx interface required in the communication bus

1

2

3

off – device is off 

on – device is on 

1x – warning/error,  

check nx interface

 

Manual ON/OFF button 

- Clear error 

--- ON/OFF (1s < push < 3s) 

---– enable/disable buzzer  

 

(5s < push < 7s) 

------– no effect (>7s)

 

off – no error 

on – device is off 

1x – low battery 

2x – overload 

3x – high temperature 

4x – warning/error,  

check nx interface

Содержание next 3

Страница 1: ...swiss made power quick guide next 3 ...

Страница 2: ...Ce next3 a été conçu fabriqué assemblé et testé dans notre usine en Suisse Il bénéficie d une garantie de 6 ans et est éligible à une extension 6 6 dans le cadre du programme studercare pas encore disponible consultez votre représentant studer pour plus d informations DE Herzlichen Glückwunsch Wir freuen uns dass Sie sich für eines High Tech Gerät entschieden haben welches bei der Energie manageme...

Страница 3: ...rhafter Wartung ergeben oder in irgendeiner Art und Weise damit zusammenhängen Der Einsatz und Betrieb der studer Geräte obliegt in jedem Fall der Verantwortung des Kunden Lesen Sie die Sicherheits und Betriebsanweisungen sorgfältig durch Die Installation muss qualifiziertem Personal anvertraut werden Überprüfen Sie die Bedienungsanleitung online Brauchen Sie Hilfe ES Exclusión de responsabilidad ...

Страница 4: ...50mm min 550mm min 120mm min 150mm min 290mm 716mm 58 kg 454mm min 350mm 352mm 756mm Mounting and installation Storage and content Mounting place The batteries should only be installed by qualified personnel Fixing and dimensions 1 2 3 5x ...

Страница 5: ...x connector Protection device PV side Overvoltage protection SPD 4x900Vdc 1 per input In parallel similar strings with the same number of modules MPPT1 string 1 1 string 1 2 MPPT2 string 2 1 string 2 2 GND CANH CANL shield bus termination CAN BMS Communication with Lithium batteries Connector included Check list Communication studer nx communication bus 2x RJ45 black flat cable nx interface multi u...

Страница 6: ...connection 2x input limit 3x check phase rotation 4x warning error check nx interface on AC flex load powered 400 Vac 1x standby load search 2x warning error check nx interface on battery connected 1x battery low 2x warning error check nx interface State of charge 0 to 25 25 to 50 50 to 75 75 to 100 Upper LED not for lithium on floating 1x bulk 2x absorption 3x equalization on solar PV producing 1...

Страница 7: ...allel 1 internal transfer common battery Not yet available Multi unit and multi battery Dashboard synoptic Display real information Configuration Configuration assist Guided configuration not screen during 1st start User menu Dashboard Synoptic Graphs Notification center Remote setup Update Configuration assistant Advanced ...

Страница 8: ...ei der Entsorgung dieses Gerätes die geltenden örtlichen Vorschriften und nutzen Sie die Sammeldienste stellen für Elektro Elektronik Altgeräte ES Mantenimiento y reciclaje A excepción del control periódico de las conexiones apriete estado general el next no requiere un mantenimiento particular Para la eliminación del producto acuda a los servicios de recogida de residuos eléctricos y cumpla todas...

Страница 9: ... 27 205 60 80 or visit studer innotec com support Studer Innotec SA rue des Casernes 57 1950 Sion Switzerland info studer innotec com Serial Number Installed by Date Signature 4O92 All rights reserved Studer Innnotec SA V1 1 ...

Отзывы: