Stuart CC130 Скачать руководство пользователя страница 22

MANUFACTURER’S LIMITED LABOUR AND PARTS WARRANTY

STUART COMMERCIAL ICEMAKERS

Model CC130, CC270, CC450, CC900, CC1800

CERISUN PTY. LTD. trading as STUART MANUFACTURING at 1 JAYELEM CRESCENT PADSTOW  

warrants to the original owner/user that any STUART commercial icemaker manufactured on or after Janu-

ary 1st 1997 shall be free of defects in material or workmanship under normal and proper use and mainte-

nance service as specified by STUART MANUFACTURING and upon proper installation and start-up in 

accordance with the instruction manual supplied with the Product.

The obligation under this warranty is limited to:

(1) 

 

associated and approved labour costs for a period of two years after original installation date;

(2) 

 

the repair and or replacement of parts or assemblies that in the opinion of STUART MANU-

FACTURING are defective, for  

 

a period of two years after the date of original installation;

(3) 

 

the supply or repair of the electronic control board(s) for the lifetime of the Product.

The labour warranty shall include straight time labour charges at the product location only and shall exclude 

charges for travel time, mileage or other premium charges.

Any labour required to fulfil the warranty obligation must be performed by a refrigeration service company 

qualified and accepted by STUART MANUFACTURING.

This warranty does not include parts or labour coverage for components failure or other damage resulting 

from:

 

external electrical power failure or miswiring to the Product for any reason

 

external water supply failure or plumbing problems to the Product for any reason

 

external drain line malfunction

 

adverse operating conditions as set forth in the owner/user manual for the Product.

All claims for labour or parts must be made through the original reseller. The defective part for which re-

imbursement is claimed, together with the service invoice, must be returned to STUART MANUFACTUR-

ING, freight pre-paid, within fifteen days from date of service to be eligible for labour and parts warranty 

coverage. All replacement parts must be approved STUART parts. Incidents of failure that do not require 

the replacement of a part shall be explained in sufficient detail on the service invoice to identify the failure. 

All claims shall include the product model number, serial number, original date of installation and customer 

identification.

The foregoing warranty shall not apply to:

Faults caused by dirty water distribution systems or icemaking plates

Adjustments to ice thickness or purge levels caused by incorrect installation.

(3)  

any part or assembly

 

 

(a) that has been altered, modified or changed

 

 

(b) that has been subjected to misuse, abuse, neglect or accidents or

 

 

(c) any Product or part on which the serial or model number has been removed or altered

(4)  

any Product that has been installed and/or maintained inconsistant with STUART technical publica-

tions

(5) 

any product that has been installed or is located outside Australia.

The two years compressor parts warranty shall not apply when the Product’s refrigeration system is modified 

with a condenser, heat reclaim device, or parts and assemblies other than those manufactured by STUART 

MANUFACTURING unless STUART MANUFACTURING has accepted modification for specific installa

-

Содержание CC130

Страница 1: ...KER MODELS CC130 CC270 CC450 CC900 CC1800 INSTALLATION AND SERVICE MANUAL Revision 6 STUART MANUFACTURING 1 Jayelem Crescent Padstow NSW 2211 Australia Telephone 02 9773 3711 Fax 02 9773 4400 www stum...

Страница 2: ...TENTS PAGE Specifications 1 Installation Instructions 2 Adjustments 3 Operation of Machine 4 5 Trouble Shooting 6 8 Logic Board Flow Chart 9 10 Main Circuit Function Diagram 11 Wiring Diagrams 12 18 P...

Страница 3: ...0kpa WATER CONNECTION REQUIREMENTS All Models 3 4 BSP male stop cock DRAINAGE All Models 25mm diameter PVC 1 CC130 CC270 CC450 CC900 CC1800 ELECTRICAL REFRIGERATION SUCTION PRESSURE 21deg C FLOODED EV...

Страница 4: ...or waste START UP PROCEDURE 1 ENSURE MACHINE IS LEVEL 2 Connect water hose and turn on water 3 Remove front and side panels 4 Turn on power 5 Wait for about 10 seconds then press and hold RESET button...

Страница 5: ...ew to increase or decrease as indicated ICE THICKNESS The correct weight of ice per cycle has been factory set with the machine LEVEL If the machine is not installed level this can alter the weight si...

Страница 6: ...ect the machine from damage in the event of a power failure during the freezing cycle By using the WARM UP defrost CYCLE when power is restored any ice which had formed on the icemaking plates before...

Страница 7: ...cycle Press the CLEAN button the compressor stops and leaves the water pump running Allow cleaner mixture to circulate until the icemaking plates are clean When the icemaking plates are clean remove...

Страница 8: ...ESET button 6 The selected diagnostic value is displayed on the numeric display 7 To cancel the diagnostic function press the RESET button again CHECKING OPERATION OF REED SWITCHES The curtain flap sw...

Страница 9: ...hine The correct replacement fuse is a slow blow HRC Ceramic Refer parts list for correct size DO NOT USE GLASS TYPE FUSES When changing circuit boards ensure that a The incoming active goes to the re...

Страница 10: ...rotating 180 degrees ERROR 4 DID NOT MAKE ICE IN TIME 40 Minutes 1 Partial loss of refrigerant 2 Faulty fan motor 3 Dirty condenser 4 Faulty compressor 5 Hot gas solenoid stuck open 6 Restricted capi...

Страница 11: ...S CLEAN BUTTON YES HAS ICE MAKE TIMER TIMED OUT YES HAS THE CORRECT AMOUNT OF WATER BEEN USED TO MAKE ICE YES SET DEFROST PUMP OFF HOT GAS SOLENOID ON BOTH FLAP SWITCHES OPERATED YES DID BOTH FLAPS CL...

Страница 12: ...IME COMPRESSOR FILL AND PUMP OFF DISPLAY ERROR CODE 3 RE TRY EVERY HOUR DID THE TROUGH FILL RETURNTO ICE MAKE CYCLE YES NO RESET BUTTONPUSHED NO YES DID NOT MAKE ICE IN TIME DID NOT DEFROST IN TIME CO...

Страница 13: ...11...

Страница 14: ...12...

Страница 15: ...13...

Страница 16: ...14...

Страница 17: ...15...

Страница 18: ...16...

Страница 19: ...17...

Страница 20: ...18...

Страница 21: ...8 050326 050023 050347 1 4mm 2625mm 050009 050010 050011 050043 050065 050043 050045 050046 CC270 050383 050348 050326 050023 050347 1 78mm 2500mm 050009 050010 050011 050043 050065 050043 050045 0500...

Страница 22: ...y failure or plumbing problems to the Product for any reason external drain line malfunction adverse operating conditions as set forth in the owner user manual for the Product All claims for labour or...

Страница 23: ...only warranties made in connection with the sale and distribution of the Products ANY AND ALL OTHER EXPRESSED STATUTORY AND IMPLIED WARRANTIES APPLICABLE TO THE PRODUCT INCLUDING WITHOUT LIMITATIONS...

Страница 24: ...properly iden tify the nature of the failure 5 The labour warranty includes standard straight time charges at the installation location only and does not include charges for travelling time mileage or...

Страница 25: ...ll be covered on a pro rata basis up to the warranty expiration of equipment in which they are installed b Warranty on spare parts other than the above is three 3 months from the date of installation...

Отзывы: