
13
DRAIN, HOSE AND BRACKET PLACEMENT ILLUSTRATIONS
NOTE: BELOW ILLUSTRATIONS MAY
NOT EXACTLY REFLECT EVERY
PARTICULAR CASE’S FEATURES
2. Hot Gas Condensate System
Hot gas serpentine coil is routed through a condensate
reservoir allowing water to be heated. This system
uses a wicking material (partially submersed) with
warm condenser air passing through it for evaporation.
Also incorporates an overflow reservoir with heating
element to ensure complete condensation removal.
Three Condensate Systems Are Illustrated Below:
Illustration #1: Hot gas “CopeVap” condensate
system. “Copevap” is built into compressor unit.
Illustration #2: Hot gas condensate system.
Illustration 3A/3B : Electrical heat rod condensate
system. Note: Separate condensate pan.
>> Warning! Regardless of condensate system,
hose and drain trap MUST BE secured and
positioned over condensate pan to prevent water
seepage / spillage.
>> When sliding out condenser unit, be careful that
drain is not pulled from proper position.
1. Hot Gas “CopeVap” Condensate System
Clear PVC
Tube
Drain Trap
Hose thru bracket
Bracket
Note: Drain
positioned
directly over
Reservoir
“CopeVap”
Reservoir
Clamp
3B. Isometric View of
Electrical Heat Rod Condensate System
Condensate Pan
Cond. Pan Positioning Bracket
Use Hose Clamp
to Secure Hose
to Adapter
Clear PVC
Tube
Drain
Trap
Refrigeration
Assembly
Base
Compressor Pan
Shipment Screw
(1 at each side)
Wicking
Material
This area of your unit
may widely vary (due to
display case options).
Suction
Accumulator
Hot
Serpentine
Coil
Receiver
Elec. Box, Hot
Gas Condensate
Overflow
Scroll
Compressor
Fan
Shroud
Filter
Drier
Sight Glass
3A. Front View of
Electrical Heat Rod Condensate System
Condensate
Pan
Drain
Trap
Condensate
Pan
Positioning
Bracket