22
Strong Enterprises owner’s manual. Para-Cushion model 311 Wedge
11236 Satellite Blvd. Orlando, FL 32837 Tel.: (407) 859-9317 Fax: (407) 850-6978
www.strongparachutes.com
6.8.3
From middle grom
-
met, make a short 90˚
fold to outer edge of
the right side of con
-
tainer.
This will help to
smooth out the end of
previous fold.
6.8.4
The remainder of the
canopy will be stowed
in three side-to-side
folds. To do this, fold
canopy across left side
of the container and
then back across to
the right side. Both
of these folds should
be between the top
two grommets. The
last fold is across the
top of container above
top grommet. Spread
apex out flat and fold
under.
Route bridle down the
center of the container
toward the bottom.