
27
MA_VEB100-1-2-2W-4-5_A3-1_190627_en.doc
3.2
Needle lever
3.2.1
Assembly
A T T E N T I O N !
Switch off the machine electrically!
Remove screw (1), move the Thread take-up lever and remove the needle lever. During
installation, please ensure that the needle runs through the centre of the needle
groove and the needle tip is flush with the left needle guide (Fig. 6).
Fig. 6
Содержание VEB100-1
Страница 4: ......
Страница 8: ...4 MA_VEB100 1 2 2W 4 5_A3 1_190627_en doc...
Страница 26: ...22 MA_VEB100 1 2 2W 4 5_A3 1_190627_en doc Fig 1 a Cl VEB100 1 2 b Cl VEB100 2W c Cl VEB100 5 d Cl VEB100 4...
Страница 33: ...29 MA_VEB100 1 2 2W 4 5_A3 1_190627_en doc Fig 8...
Страница 62: ......