15
5.4 BOILER CASING mod. 350 GT/JB-670 JB (Fig. 6)
•
Mount the panels (1D) fixing the lower folds on to the metal strut on the boiler and attaching the upper
ones to the centre with the appropriate screws. Repeat the same procedure for the panels (1S).
•
Mount the panels (2D) fixing the upper folds to the rectangular section and inserting them into the appropriate
slits in the lower panels. Repeat the same procedure for the panels (2S) leaving the burner-control
panel connection cables sticking out from the existing opening
(for the wiring harness please refer to the
control panel diagram and to the standard plugs connection kit).
•
Unwind the thermostat capillaries, attach the control panel (3) to the side with a screw, then insert the
bulbs into the boiler pockets
•
Mount the upper panels (4P), (4D) and (4S) with screws and plug the holes with the caps.
•
Mount the panel (5); attach the support bracket (6) to the frame base, position the panel (7D) and then
the panel (7S) with plate attached to its side panels. Screw on tightly and plug the holes with the appropriate caps.
•
Attach and screw on the front/central (8) and front/lower (9) panels.
•
Finally, screw the document holder (10) on to the opposite side to the control panel.
Содержание ML 125 GT
Страница 1: ...19 STREBEL TECHNICAL MANUAL ML GT ML JB LOW NOx CONDENSING BOILERS ...
Страница 3: ...2 ...
Страница 4: ...3 ...
Страница 6: ...5 MODEL 160 GT 350 GT SHOWN BELOW WITH DIMENSIONS ON THE NEXT PAGE ML ML Capillary bulb pockets ...
Страница 7: ...6 ML ML ML BOTH NATURAL GAS AND LPG ACCORDING TO THE BURNER SPECIFIED 3 2 ML 30 JB 670 JB ...
Страница 8: ...7 Capillary bulb pockets ...
Страница 9: ...8 ML ML ...
Страница 19: ...18 ...