![Strebel ASCONA A Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/strebel/ascona-a/ascona-a_installation-operating-and-maintenance-manual_1384097016.webp)
12/06/00
Page 16
ASCONA ‘A’ & ‘APV’ INSTALLATION INSTRUCTIONS
15.0 USERS OPERATING AND MAINTENANCE INSTRUCTIONS
To light the Boiler
1
Check that the boiler gas supply valves are turned ON and that the gas supply is ON at the
meter.
2
Set the thermostat to the required temperature.
3
Switch on the electricity supply.
4
Pilot burner will light followed by main burners.
5
If red lock out light shows on control panel (No1), reset by pressing red light (No11) after
approximately one minute, then the red light light will go out and boiler will restart.
If the boiler malfunctions repeatedly contact a competent boiler servicing engineer
To shut down Boiler.
1.
Switch OFF electricity supply
2.
If shutting down for an extended period, also turn OFF the gas supply isolating valve.
Maintenance
We recommend that the boiler is serviced at least annually by a competent boiler servicing engineer
Control Panel Layout
1. Burner Lockout Lamp
7. Boiler Control Thermostat
2. Run Lamp
8. On / Off Switch
3.Heating Pump Lamp
*9. High Temperature Limit Thermostat Reset*
4.Flue spillage Lamp
*10. Flue Gas Spillage Thermostat Reset*
5.High Temperature Limit Lamp
11. Burner Lockout LED & Reset Button
6.Boiler Thermometer
* Remove cover and press button