10
Check if the inlet valve is under normal operation and adjust
the inlet valve float adjustment thumbscrew clockwise (for
higher float & water level) or anticlockwise (for lower float &
water level).
Screw inlet hose onto stop tap. Place inlet valve into
position within the cistern.
Before proceeding, ensure that all valves are configured as
per diagram above.
Screw button set onto ceramic cistern cover. Ensure the half
and full flush is lined up correctly with the correct positions
on the outlet valve.
Slide ceramic cistern cover over the plastic cistern, ensuring
that the grooves on cover and plastic cistern line up. This will
ensure the cover sits securely.
9
3
11
12
7
Fit outlet seal to bottom of outlet mechanism.
Do not place
outlet seal on pan and then sit cistern on top!
8
Remove inlet mechanism. Locate the cistern onto the pan.
Screw down
by hand until tight
to ensure a seal between the
bolt head and the bottom of the cistern. The cistern should sit
flush against the wall.