Streamline Supplies Carmen Скачать руководство пользователя страница 12

w w w . s t r e a m l i n e s u p p l i e s . c o m . a u

12

Water Circuit Semi-automatic 2 group.

Key

A.

 Boiler 

B.

 Heat exchanger

1.

 Water circuit feeding pipe

2.

 Pump

3.

 Boiler water Filling 

    Solenoid valve

4.

 Non-return Valve

5.

 Expansion valve

6.

 Water Discharge Vessel

7.

 Coffee delivery group

8.

 Pump/boiler

9.

 Steam valve 

10.

 Water valve

11.

 Relief valve

12.

 Delivery group 

      solenoid-valve

13.

 Pressure switch

14. 

Hot water delivery solenoid valve

Key

A.

 Boiler (ex 2 groups)

B.

 Heat exchanger

1.

 Water circuit feeding pipe

2.

 Pump

3. 

Boiler water filling

    Solenoid valve

4.

 Non-return valve

5.

 Expansion valve

6.

 Water discharge vessel

7.

 Coffee delivery group

8.

 Pump/boiler pressure guage

9.

 Steam valve

10.

 Boiler water level indicator

11.

 Relief valve

12.

 Delivery group 

      solenoid-valve.

13.

 Pressure switch

14.

 Hot water delivery solenoid valve

15.

 Volumetric counter

      (flow-rate sensor.)

A

B

1

2

3

4 5

6

7

8

9

9

10

11

12

13

14

14

A

B

1

2

3

4 5

6

7

8

9

9

10

11

12

13

15

15

Water circuit, Automatic 2 Group

Electric Diagram

The machine is connected to the electric mains by a supply cable. 

As shown on the electric diagram there are two circuits:

- A feeding circuit for electric components (solenoid valves,  

 

  pump motor, electronic control panel.

- A feeding circuit for the heating element. 

Содержание Carmen

Страница 1: ...www streamlinesupplies com au 1 Carmen Operating Instructions Streamline Supplies 9 Joseph Baldwin Place Shepparton Victoria 3630 Ph 03 5831 5555 Fax 03 5821 3633 ...

Страница 2: ...book are in no way a substitute for the safety instructions and technical data on the machine or the packaging concerning installation and function This handbook is an essential part of the machine For further information or additional handbooks please contact your distributor or the manufacturer This handbook reflects the current manufacturing requirements and is subject to change according to fu...

Страница 3: ...es and boiler All maintenance procedures must be carried out exclusively by authorized technicians and all spare parts must be genuine Any modification or forcing performed by persons not authorized by the Manufacturer will void all warranties covering the appliance The motor pump set must be positioned away from hydraulic pipes heat sources electrical appliances or it must be protected by a water...

Страница 4: ...manual boiler water refill is standard Volumetric pump with motor for remote installation on 3 4 group machines Machine available with 1 2 3 4 groups Semi Automatic Espresso coffee machine with manual start stop dosing control Automatic and manual water boiler refill is standard Volumetric pump with motor Machine available with 1 2 3 groups Espresso Coffee Machine Range ...

Страница 5: ... Button Panel Semi Automatic Automatic Coffee delivery control key Hot water delivery control key 1 short coffee 1 normal coffee 1 long coffee 2 short coffee 2 normal coffee 2 long coffee Hot water delivery control key Manual coffee delivery control Key Attention The 4 group machine has two separate control circuits each controlling two groups for this reason it is necessary to program the 1st gro...

Страница 6: ...re needed for espresso coffee preparation which is 9 bar STEAM WAND This wand delivers hot steam for milk frothing and steaming of drinks in jugs milk chai chocolates etc HOT WATER TAP This delivers hot water CONTROL MONITORING DEVICES Pressure gauge Indicates the boiler pressure and the working pressure of the pump Pressure switch This is used to keep the boiler water temperature constant by cont...

Страница 7: ...chine is equipped with a main power supply switch with 3 positions Pos 0 No power supply to internal components Pos 2 Power supply to function components Pos 1 Power supply to functional components and electric boiler heating elements 0 0 0 2 2 2 1 1 1 ...

Страница 8: ...liance the conformity declaration of the product will be voided and so the Manufacturer s responsibility Possible replacement of the supply cable if damaged must be performed immediately and exclusively by service staff qualified or authorized by the Manufacturer in order to prevent any danger to persons Before the connection of the appliance to the fixed installation verify if a conformity certif...

Страница 9: ...e water drain hose to the machine Hydraulic connections water inlet 3 8 water drain hose internal Ø 14 mm The machine must be installed on a stable surface Find a good position for the water filter Connect a valve to the pipe Connect the pipe to the water inlet connector Con nect the pipe to the discharge receptacle and then onto the drain system Put a drain under the water filter discharge pipe a...

Страница 10: ... we recommend to program each group keyboard individually The programming operation between a key and the other has to be completed within 30 seconds otherwise the memory will be lost For partial keyboard dose setting push star key again after the last selected dose key has been programmed Start up Turn the main switch to pos 2 The filling process will proceed automatically When the boiler is fill...

Страница 11: ...r stream of water from delivery group Turn off Re insert handle with blind filter start and stop cycle 10 times run for 5 seconds stop for 2 seconds to ensure thorough rinsing Remove blind filter and insert regular filter Brew and discard a single espresso to re season machine Procedure to clean filters and group handles Soak group handles and filters in 500ml of hot water with 2 scoops of GruppoK...

Страница 12: ... Solenoid valve 4 Non return valve 5 Expansion valve 6 Water discharge vessel 7 Coffee delivery group 8 Pump boiler pressure guage 9 Steam valve 10 Boiler water level indicator 11 Relief valve 12 Delivery group solenoid valve 13 Pressure switch 14 Hot water delivery solenoid valve 15 Volumetric counter flow rate sensor A B 1 2 3 4 5 6 7 8 9 9 10 11 12 13 14 14 A B 1 2 3 4 5 6 7 8 9 9 10 11 12 13 1...

Страница 13: ... 4th group Key 11 Boiler filling pilot lamp 12 Automatic filling solenoid valve 13 Hot water delivery solenoid valve 14 Keyboard 1st group 15 Keyboard 2nd group 16 Keyboard 3rd group 17 Keyboard 4th group 18 Boiler level sensor 19 Control board e g Semi Automatic 4 group 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 1 1 1 1 12 12 13 14 14 15 15 16 16 17 18 19 19 18 17 13 R N R S T N 1 1 2 2 3 3 4 4 5 ...

Страница 14: ...h group 11 Boiler filling pilot lamp 12 Automatic filling solenoid valve Key 13 Hot water delivery solenoid valve 14 Keyboard 1st group 15 Keyboard 2nd group 16 Keyboard 3rd group 17 Keyboard 4th group 18 Boiler level sensor 19 Control board 20 Flow rate sensor 1st group 21 Flow rate sensor 2nd group 22 Flow rate sensor 3rd group 23 Flow rate sensor 4th group 1 2 3 4 5 6 7 8 9 10 1 1 12 13 14 15 1...

Страница 15: ...lace motor 2 Replace heat exchanger 3 Replace solenoid valve water leakages on table top 1 Drain basin is dirty 2 Exhaust pipe is disconnected or clogged 1 Clean drain basin 2 Replace drain pipe Coffee dregs are wet 1 Coffee grinding is too fine 2 Group is still cold 3 Group solenoid valve doesn t work properly 1 Adjust grinding degree 2 Wait for appliance to get warm 3 Clean group exhaust system ...

Страница 16: ... incorrect installation or maintenance periodic regeneration of water softener not effected problems caused from the electric and hydraulic supplies of the client installation by non authorized persons non genuine parts seals filters gutters etc Not included in the warranty conditions are incorrect use of the machine and non observance of the maintenance and technical handbook For no reason can th...

Отзывы: