![Strautmann Plus 70 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/strautmann/plus-70/plus-70_translation-of-the-original-operating-instructions_1383801025.webp)
Transportation and
installation
V 152 10 11
Rev.: END
4-2
●
Attach the transport cables to the crane hook in such a way that when they are
taut they do not touch machine components located above the suspension bores.
●
If required, use lifting gear.
●
Adjust the length of the 4 support cables so that the gantry press is suspended
horizontally. Attach the support cables to the suspension brackets using shackles.
●
When selecting the shackles, ensure that each individual shackle has an
adequate load-bearing capacity!
Содержание Plus 70
Страница 58: ...Appendix V 152 10 11 Rev END 8 2 8 1 Declaration of Conformity...
Страница 59: ...Appendix V 152 10 11 Rev END 8 3 8 2 Assembly drawings...
Страница 60: ...Appendix V 152 10 11 Rev END 8 4 8 3 Parts list with recommended identified spare parts...
Страница 61: ...Appendix V 152 10 11 Rev END 8 5 8 4 Hydraulic diagram parts list...
Страница 62: ...Appendix V 152 10 11 Rev END 8 6 8 5 Circuit diagram parts list...
Страница 63: ...Appendix V 152 10 11 Rev END 8 7 8 6 Supplier documentation...