Safety instructions
77
Giga-Vitesse CFS 3602 - 4402, Giga-Vitesse CFS 3602 DO - 4402 DO 03.18
3.4.10
Cleaning, service, maintenance and trouble-shooting
•
As a basic principle, carry out cleaning, service and maintenance work on the machine only
with the tractor engine turned off,
with the ignition key pulled out,
with the parking brake applied on the tractor and trailer,
with the machine plug removed from the on-board computer.
•
Regularly check screws and nuts for tightness and retighten them if necessary!
•
Secure the lifted machine or lifted machine parts against accidental lowering before carrying out
cleaning, service or maintenance work on the machine!
•
Use appropriate equipment and gloves when replacing working tools with blades!
•
Dispose of oils, greases and filters properly!
•
Disconnect the generator and battery cables on the tractor before carrying out electrical welding
work on the tractor and attached machines!
•
Spare parts must at least comply with Strautmann's specified technical standards, which is
ensured when using original Strautmann spare parts!
•
Carry out the stipulated setting, maintenance and inspection work in due time.
•
Secure all operating media such as compressed air and hydraulic against accidental startup.
•
Fix larger assemblies carefully to lifting equipment and secure them before replacing them.
•
Check loosened screwed connections for tightness. After finishing maintenance work, check the
safety and protective devices for proper functioning.
•
Close or mount protective devices which have been opened or removed for carrying out service
and maintenance work on the machine before powering the machine.
3.4.11
Risks due to residual energy
Pay attention to the possible occurrence of mechanical, hydraulic, pneumatic and electrical/electronic
residual energies on the machine.
Take respective measures when instructing the operating staff. For detailed information, please refer
to the respective chapters of these operating instructions!
Содержание Giga-Vitesse CFS 3602
Страница 2: ......
Страница 4: ...Bad Laer den 26 03 2018 Dipl Kfm W Strautmann Managing Director...
Страница 304: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 304 11 Circuit diagrams...
Страница 305: ...Circuit diagrams 305 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 11 1 Hydraulic circuit diagram...
Страница 306: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 306 Fig 174...
Страница 309: ...Circuit diagrams 309 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18...
Страница 310: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 310...
Страница 313: ...Circuit diagrams 313 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18...
Страница 314: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 314...
Страница 317: ...Circuit diagrams 317 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18...
Страница 318: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 318...
Страница 320: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 320...
Страница 326: ......