AC Power and HVAC Service Requirements
3-4
Stratus ftServer 2500, 4400, and 6200 Systems: Site Planning Guide
(R609)
To determine HVAC requirements
1. Add together the values from the Total row of Tables
,
, and
and enter
the value in the Total Watts column of
.
2. Multiply the value in the Total Watts column by 3.41 and enter the number of BTUs
in the BTUs/hr. Subtotal column.
Table 3-3. Worksheet: Determining External Power Requirements
System Component
Watts
Other peripheral components
TOTAL EXTERNAL POWER REQUIREMENTS
Table 3-4. HVAC Requirements
Total Watts
(From Tables
, and
Convert to BTUs
BTUs/hr. Subtotal
x 3.41 =
Содержание ftServer 2500
Страница 1: ...Stratus Technologies R609 04A Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide ...
Страница 5: ...Contents Contents v Index Index 1 ...
Страница 12: ...Preface xii Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 29: ...Safety Notices Site Planning for ftServer 2500 4400 and 6200 Systems 1 17 W A R N I N G ...
Страница 30: ...Safety Notices 1 18 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 56: ...Planning for Cables 4 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 68: ...Modem Requirements for Brazil 5 12 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 74: ...Sample PDU Usage Calculation 6 6 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 98: ...Electrical Power Connectors B 10 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 106: ...Index Index 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...