Stratford EcoBoiler Скачать руководство пользователя страница 40

 
 

 

 
 
 

BK127 

Factory Check list 

Stove Model …………………….……... 
 
Serial No

. ………………………………. 

 

I’ve checked it 
and its O.K 

Quality 

 

Finish 

 

Flue Outlet (Not EB7) 

 

Hot Plate (Not EB7) 

 

Fuel Retainer 

 

Grate Bars 

 

Rear Fire Bed Surrounds  

 

FEDS Cover 

 

Air Wash 

 

Door Handle 

 

Ash Pan 

 

Operating Tool 

 

Thermostat 

 

Mitten 

 

Operating & Installation Manual 

 

Assembled By………………………. 
 
 
Checked by…………………………. 

Date of Purchase………………………… 

 

Name and Address of Supplier…………………………………………………………………............ 

 
…………………………………………………………………………………………………..... 
 
…………………………………………………………………………………………………..... 
 
......................................................................................................................................................... 

Arada Ltd 

The Fire Works 

Weycroft Avenue 

Axminster 

Devon 

EX13 5HU 

United Kingdom 

 

Tel: +44(0)1297 35700           Fax: +44(0)1297 35900           

www.arada.uk.com

 

Содержание EcoBoiler

Страница 1: ...PLEASE RETAIN THIS GUIDE FOR FUTURE REFERENCE Operating Installation Manual Stratford Eco Boiler HE Stove BK127 Rev 03 Aug 2011 Part No AFS1552...

Страница 2: ...set please contact the Stratford dealer in your area or call our technical support department on 0844 8475107 Copyright 2011 Arada Ltd This booklet has copyright and may not be copied in whole or par...

Страница 3: ...8 Water connections 19 Hot water system check list 20 Final installation check list 21 Building Control Consent Checklist Page No SERVICE MAINTENANCE Annual Maintenance 22 Cleaning 22 Chimney Sweeping...

Страница 4: ...Y HETAS IF IN DOUBT CONTACT HETAS LIMITED TELEPHONE NUMBER 0845 634 5626 www hetas co uk THIS STOVE MUST NOT BE CONNECTED TO A SHARED FLUE SYSTEM TO ALL USERS PETROLEUM COKE SOME OF WHOSE BRAND NAMES...

Страница 5: ...rn equipment available It is a highly efficient and sophisticated piece of machinery and when properly installed and operated it should provide a lifetime of heating satisfaction Safety is the most im...

Страница 6: ...ford EB 12 Stratford EB 18 1 Fuel retainer 1 1 1 1 2 Grate bars 7 7 9 11 3 Lower FEDS cover 1 1 1 1 4 Flue spigot N A 1 4 1 5 1 5 5 Hot plate N A 1 4 1 5 1 5 6 Ash pan 1 1 1 1 7 Operating tool 1 1 1 1...

Страница 7: ...all height 570 570 603 659 Overall Width 489 489 561 615 Overall depth 417 417 412 402 Height to centre of rear flue 431 431 442 501 Depth from back to centre of top flue N A 144 149 147 Flue diameter...

Страница 8: ...capacity If the existing construction does not meet this prerequisite suitable measures e g load distributing plate should be taken to achieve it Ideally the appliance should stand on a constructional...

Страница 9: ...bled GRATE BAR REPLACEMENT After extended use it may be necessary to re place some of the grate bars Periodic inspection of the bars is recommended and the removal of any nails or wire that may be pre...

Страница 10: ...d The inner section of the FEDS is welded in place during manufacture and requires nothing more than the removal of any residues produced by the flue gases that may have built up on the surfaces The O...

Страница 11: ...n four main factors Flue gas temperature Flue height Flue size Flue terminal The stove must be connected to a suitable and efficient flue that provides a good up draught to safely take the products of...

Страница 12: ...equirements in respect of providing a notice plate giving details on the chimney Document J of the building regulations for England and Wales is available from The Stationary Bookshops and can also be...

Страница 13: ...o circumstances should this appliance be connected to a shared flue system that serves any other heating appliance Typical Rear Flue Outlet As Per BS 8303 1 Stratford EcoBoiler Stove Minimum 150mm 6 D...

Страница 14: ...03 1 Typical Metal Insulation Chimney System Installed to the chimney manufacturers instructions in compliance with Building Regulations and BS EN 15287 Pts 1 to 4 14 PLAN VIEW OF REGISTER PLATE AND C...

Страница 15: ...ng Warning If a pipe stat is not fitted to control the radiator circulation pump then cold water corrosion can occur FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL INVALIDATE THE GUARANTEE CHECKING TH...

Страница 16: ...ic Hot water System Using Four Boiler Tapings Central Heating Without Domestic Hot water System Using Four Boiler Tapings Note Diagrammatic representation only Design and calculations for individual s...

Страница 17: ...c Hot water System Using Three Boiler Tapings Central Heating Without Domestic Hot water System Using Three Boiler Tapings Note Diagrammatic representation only Design and calculations for individual...

Страница 18: ...Stratford EcoBoiler Stove 18 INSTALLATION Boiler Tapping Positions Dimensions mm EB 7 EB 9 EB 12 EB18 A 260 260 326 384 B 288 288 324 361 C 255 255 252 270 D 356 356 422 481...

Страница 19: ...care must be taken to ensure that effective circulation can occur around the primary circuit to carry the heat away and thus prevent boiling The output of any radiator installed as a Heat Leak should...

Страница 20: ...d ensure there are no air locks HOT WATER SYSTEMS Is boiler cross flowed YES NO Are the pipes correctly sized YES NO What is the calculated output required to heat the system Is a heat leak fitted YES...

Страница 21: ...Profession Capacity Telephone No Address Postcode Signed Date Registered member of e g GAS SAFE CORGI OFTEC HETAS NACE NACS 7 Hearth Form of construction new or existing 8 Inspection and testing afte...

Страница 22: ...luding the outlet at least twice a year per burning season It is important that the flue ways flue pipe and chimney be cleaned prior to lighting the fire after a prolonged shut down period For removal...

Страница 23: ...e control knob fully clockwise as viewed with the damper shaft to your left until you reach the end of possible travel Place the thermostat on a flat surface with the base of the mechanism body on a s...

Страница 24: ...the stove front and lift the door off its hinges Gently tap the hinges in the direction required to compensate for the misalignment Fig 7 Re fit and check repeat above procedure if necessary If the fi...

Страница 25: ...onto a flat surface with the rear face upwards Carefully remove the old rope gasket and old adhesive Take note of the layout of the rope seal Ensure no traces of the old adhesive or rust flaky paint...

Страница 26: ...dhesive backing on the rope as you go start at the bottom of the window centrally Push the adhesive side of the rope into the grove on the rear of the door casting gradually work your way round until...

Страница 27: ...ITY The build up of ash within the inner left landing cavity may take a considerable time to become evident However if left unchecked it may build up to such an extent that it could spill over into th...

Страница 28: ...stove that are not covered in this manual please contact your Arada dealer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits so they can comp...

Страница 29: ...left unattended Thermostatic control Stratford EcoBoilers have a thermostatically controlled air inlet beneath an access cover The damper plate at the side of the stove regulates the amount of under d...

Страница 30: ...he Air wash and Easy Boost air inlet position when the stove is alight and or hot and for emptying the ash pan See Fig 18 RIDDLING Use the operating tool to set the grate bars in the correct position...

Страница 31: ...ept and is free from obstruction Adequate provision for combustion air has been made i e a permanent vent of at least 550mm per kW of rated output above 5 kW is fitted in the room in which the applian...

Страница 32: ...32 OPERATING INSTRUCTIONS Longer Burning Periods The appliance will burn for long periods at a reduced output rate provided Sufficient fuel is placed in the firebox The air controls are set correctly...

Страница 33: ...t should be given a thorough clean to remove ash and unburned fuel residues To enable a good flow of air through the appliance to reduce condensation and subsequent damage leave the air controls fully...

Страница 34: ...to scale Stratford EB 7 Stratford EB 9 Stratford EB 12 Stratford EB 18 Stand Stand7 9HE Stand7 9HE Stand12HE Stand18HE Floor Fixing Kit AFS1135 AFS1135 AFS1135 AFS1135 Touch up Paint aerosol AFS101A...

Страница 35: ...58 AFS1559 AFS1560 FEDS Lower Plate AFS1541 AFS1541 AFS1334 AFS1334 Grate Bar AFS001 AFS001 AFS001 AFS001 Hot Plate Not Used AFS009B AFS010 AFS010 Operating Tool AFS008 AFS008 AFS008 AFS008 Ashpan AFS...

Страница 36: ...it 2 x Hinges 4 x screws AFS1279 AFS1279 AFS1279 AFS1279 Fire Door Rope Kit Glue AFS1021 AFS1021 AFS1021 AFS1021 Door Assembly AFS1540 AFS1540 AFS1562 AFS1563 Fire Door Locking Assembly AFS1385 AFS138...

Страница 37: ...FS1332 Operating and In struction Manual AFS1552 AFS1552 AFS1552 AFS1552 Thermostat Access Cover AFS1321 AFS1321 AFS1321 AFS1321 Heat Resistant Glove AFS1285 AFS1285 AFS1285 AFS1285 Control Knob AFS14...

Страница 38: ...g petroleum coke etc Nor can the guarantee be extended to deterioration of parts through fair wear and tear Firebox linings grate bars fuel retainer FED throat plate gasket material and door glass are...

Страница 39: ...Stratford EcoBoiler Stove ADDITIONAL NOTES 39...

Страница 40: ...ate Bars Rear Fire Bed Surrounds FEDS Cover Air Wash Door Handle Ash Pan Operating Tool Thermostat Mitten Operating Installation Manual Assembled By Checked by Date of Purchase Name and Address of Sup...

Отзывы: