CONSTRUCTION

MARKING OUT CARPORT POSITION

A) IN GROUND FOOTING

Note: These column locations are very critical, as the

roof sheet lengths are governed by these

dimensions.

Place stakes at the carport column locations using the

appropriate dimensions from the drawings supplied.

Therefore ensure the end frame spacing and the width of

the carport are exactly as specified in the drawings.

Tie string lines between the stakes to ensure the footings

are in line. Check the dimensions and diagonals for

squareness.

The end frame spacing, gives the centreline spacing

between the rectangular end portal frame and the internal

gable portal frame. Where more than two internal portal

frames are required, space at the dimensions specified on

the drawings supplied.

Dig holes to the required size as stipulated by your Council

Application Form. Place bricks in the bottom of the holes to

give a solid base onto which the footing knuckles can be

positioned.

If bolting columns onto existing concrete slab check to

ensure concrete dimensions are as specified by your

Council. Stratco does not take any responsibility for

concrete failure.

Mark the position of the columns as shown in Figure 4.

using the appropriate dimensions from the drawings

supplied.

Therefore ensure the end frame spacing and the width of

the carport are exactly as specified in the drawings

supplied.

B) ON CONCRETE FOOTING

Note: These column locations are very critical, as the

roof sheet lengths are governed by these dimensions.

3

OUTSIDE OF COLUMNS

O

U

TS

ID

E

O

F

C

O

LU

M

N

S

HOLE POSITIONS

DIAGONALS

STRING LINE

STRING LINE

FRAME SPACING

FRAME SPACING

FRAME SPACING

FRAME SPACING

END FRAME

SPACING

END FRAME

SPACING

END FRAME

SPACING

END FRAME

SPACING

The end frame spacing, gives the centreline spacing

between the rectangular end portal frame and the internal

gable portal frame. Where more than two internal portal

frames are required, space at the frame spacing

dimensions specified on the drawings supplied.

Place the footing plate in the appropriate locations as

specified on the drawings supplied. The orientation of the

base plate is such that the smaller dimension runs along the

width as shown in Figure 4.

Mark the position of the holes through the existing holes in

the footing plate. Remove the footing plate and drill into

concrete using the values given in Table 1.

Use chemical anchors (for size refer to Table 1) together

with the appropriate anchor capsules and install according

to the manufacturers recommendations.

Leave the Stud Bolt undisturbed for the minimum time

specified by the manufacturer for the resin to cure. Curing

times are dependent on the concrete temperature at the

time of installation.

Footing plates are not fixed until portal frames have

been assembled.

NOTE: Do not drill completely through slab, as

chemical anchors require a solid base to bear

against.

Note:

ASSEMBLE PORTAL FRAMES

Place the three knuckle connections inside portal frame

members, using a hammer to tap in position (a block of

timber should be used whenever hammering to avoid

damaging paintwork).

Knuckles are colour coded as follows,

ensure that the correct knuckle is used for each connection.

°

°

°

Important note:

22 Ridge Knuckle - Green

22 Eaves Knuckle - Red

30 Eaves and Ridge Knuckle - Yellow

FRAME SPACING

FRAME SPACING

4

OUTSIDE OF COLUMNS

OUTSIDE OF COLUMNS

END FRAME

SPACING

END FRAME

SPACING

END FRAME

SPACING

END FRAME

SPACING

O

U

T

S

ID

E

O

F

C

O

LU

M

N

S

OUTSIDE

OF

COLUMNS

CARPORT

CARPORTS < 5000mm WIDE

IN W41 WIND SPEED

CARPORTS 5000mm WIDE

IN W41 WIND SPEED

³

CHEMICAL ANCHOR

SIZE (mm)

95

12

M10x130

115

14

M12x160

HOLE DIAMETER

(mm)

HOLE DEPTH

(mm)

TABLE 1

Содержание DUTCH GABLE

Страница 1: ...rs and columns PURLINS Purlins provide support for cladding PARTS DESCRIPTION RIDGE CAP HIP FLASHING This flashing covers the roof sheets at the gable ridge Covers the roof sheet ends along the hip ra...

Страница 2: ...15 20 21 16 17 18 19 14 13 12 19 20 1 18 16 17 12 9 13 10 5 8 4 7 3 14 2 6 21 11 15 Figure 1 2 OUTSIDE OF COLUMNS OUTSIDE OF COLUMNS OVERALL WIDTH OVERALL WIDTH END FRAME SPACING END FRAME SPACING FR...

Страница 3: ...CING The end frame spacing gives the centreline spacing between the rectangular end portal frame and the internal gable portal frame Where more than two internal portal frames are required space at th...

Страница 4: ...rews Double flange must always be on the outside of the frame Slip end rafter over connection and fasten with four coloured 10 x 16 hex head self drilling screws as in Figure 9 Note EAVESAND RIDGE CON...

Страница 5: ...otings and leave overnight to cure Note Important Note B ON CONCRETE FOOTING 11 BRACES BRICK FOOTING KNUCKLE END FRAME FINISH CONCRETE SLIGHTLY RAISED TOWARDS COLUMN CLAMP PRE DRILLPURLINS Note All pu...

Страница 6: ...hex head self drilling screws at the internal portal locations through the double flange first Fasten one of these roof purlins at the ridge as shown in Figure 13 Check roof diagonals to ensure slopi...

Страница 7: ...s to both ends of the Dutch Gable unit Note CONCRETE REMAINING FOOTINGS IN CONCRETE FOOTING GUTTERASSEMBLY Once the carport frame is complete concrete the remaining footings Only concrete the galvanis...

Страница 8: ...afters and fasten with pop rivets TYPE 12x35 ROOFING SCREWS CREST FIX TYPE 12x35 ROOFING SCREWS CREST FIX USE 5 SCREWS PER ROOF SHEET FOR EDGE USE 5 SCREWS PER ROOF SHEET FOR EDGE FIXING 3 SCREWS PER...

Страница 9: ...ition until structure is complete and concreted in This stabilises the structure and holds it square during construction Double check all measurements and drilling locations before proceeding Regularl...

Отзывы: