QUESTIONS? PLEASE CONTACT US
0800 244 266
Page 3
765 Tremaine Avenue, Palmerston North, NZ
Gearbox
Patio Blind
Installation
Ensure the roller tube inserts are slotted onto
the brackets. Take measurements for the roller
tube length and blind height (as shown) and
send to Straitline Canvas for manufacture.
Measurements need to be to the nearest
millimeter (mm) and show any ground slope.
Once done, remove the roller tube inserts to
store in a safe place until your blind is ready.
8
Attach both brackets to the wall, using the tek
screws provided. It may be easier to remove the
roller tube inserts for this step.
7
NOTE: this step is for mounting to timber only. If
you are mounting to steel, go to step 7.
Pre-drill all holes with a 3mm drill bit. Ensure
the screws will go into solid framing, not
cladding.
6
ground slope, if any
Measurements need
to be taken from the
inside of the lip
on
each roller tube insert.
Please call us if you
unsure where this is.