background image

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

QUESTIONS? PLEASE CONTACT US

 

0800 244 266

 

Page 3

 

STRAITLINE  CANVAS    

[email protected]   

765  Tremaine  Avenue,  Palmerston  North,  NZ   

www.straitline.co.nz

 

Gearbox 
Patio Blind 
Installation

 

Ensure the roller tube inserts are slotted onto 
the brackets. Take measurements for the roller 
tube  length  and  blind  height  (as  shown)  and 
send to Straitline Canvas for manufacture. 
Measurements  need  to  be  to  the  nearest 
millimeter (mm) and show any ground slope. 
Once  done,  remove  the  roller  tube  inserts  to 
store in a safe place until your blind is ready. 

 

Attach both brackets to the wall, using the tek 
screws provided. It may be easier to remove the 
roller tube inserts for this step. 

 

 

NOTE: this step is for mounting to timber only. If 
you are mounting to steel, go to step 7.  
Pre-drill  all  holes  with  a  3mm  drill  bit.  Ensure 
the  screws  will  go  into  solid  framing,  not 
cladding.

 

 

 

ground slope, if any 

Measurements  need 
to  be  taken  from  the 

inside  of  the  lip

  on 

each roller tube insert. 
Please  call  us  if  you 
unsure where this is. 

Отзывы: