Commissioning  

The below is a recommended guide of actions and checks that should be undertaken 
during commissioning:- 

DO 

 

During  commissioning,  complete  all  relevant  sections  of  the  Commissioning 
Checklist  (Page  10-12).  This  must  be  completed  during  commissioning  and  left 
with product to meet the Warranty conditions. 

 

Check the incoming mains water pressure. If the incoming mains pressure is higher 
than 3.0 Bar, fit a Pressure Reducing Valve set at 3.0 Bar maximum – recommended 
2.1  Bar  where  the  cold  supply  enters  the  property  as  this  will  create  balanced 
pressure throughout. 

 

Ensure that connections are fitted in accordance with the sketch supplied 

 

Ensure the drain is connected to allow draining of the unit if required. If a drain-
cock is fitted, we recommend a DZR fitting. 

 

Fit  the  Overflow  with  Copper  piping  or  high  temperature  plastic  to  the  thermal 
store system where required. 

 

Ensure minimum of 225mm between the top of the tank and ceiling to allow access 
to service the ball-valve if ever required. 

 

Check that all pipework connections on the tank are tight with pipes fully inserted 
following transit and handling. 

 

Fill the tank via the ball-valve in the Feed & Expansion Tank. 

 

Ensure the system is inhibited correctly – see page 6. 

 

Check the water level in the Feed & Expansion Tank, and adjust ball-valve so water 
is at lowest level. 

 

On the Automatic Fill version, turn down servicing valve once system is initially filled 
to where the warning/overflow pipe will cope with the discharge from a ball-valve 
failure. 

 

On the Manual Fill version, once the unit is filled through the pipework, close off 
the isolation valve, disconnect the flexible hose from the pipework and cap the pipe 
to avoid any dead legs. 

 

Check for leaks throughout the thermal storage system. 

 

Run all taps and other hot outlets to remove all air from the system. 

 

Immersion Heaters should be set at 70⁰C. 

Содержание Aquatherm STA140UC

Страница 1: ...0 Technical Manual Manual must be completed by Installer and left with Home Owner...

Страница 2: ...uatherm Connection Heights 3 Technical Data 3 Handling Storage 4 Mains Water Supply 4 Discharge Overflow Requirements 4 Water Treatment 5 Commissioning 6 Immersion Heaters 8 Troubleshooting 9 Aquather...

Страница 3: ...3kW Drain Cold Mains Secondary Water c w Y Strainer Hot Out c w Thermostatic Mixing Valve Boiler Coil Return High Efficiency Secondary Coil Ballvalve Boiler Control Stat 75 C Central Heating Flow Ret...

Страница 4: ...50 Central Heating Return 105 105 105 105 Boiler Flow 850 1075 1100 1300 Boiler Return 105 105 105 105 Boiler Coil Flow 555 555 555 555 Boiler Coil Return 105 105 105 105 Control Stat 340 300 300 350...

Страница 5: ...ate of 20 Litres minute Careful consideration should be made to ensure the pressure of hot and cold supplies are balanced An incoming pressure of 2 1 Bar is the most optimal for performance If the inc...

Страница 6: ...em and along with other parts of the primary circuit will require the application of a protective scale and corrosion inhibitor such as Fernox to ensure adequate protection This should avoid having co...

Страница 7: ...re plastic to the thermal store system where required Ensure minimum of 225mm between the top of the tank and ceiling to allow access to service the ball valve if ever required Check that all pipework...

Страница 8: ...eight difference is in place between the highest point of the radiator circuit and the bottom of the Feed Expansion Tank Ensure that all exposed pipework on the tank is insulated to minimalise any hea...

Страница 9: ...nd setting the Immersion Heaters at 70 C and the high limit at 90 C This can be lowered or increased as required for the installation requirements If in any doubt of how to set the Immersion or what t...

Страница 10: ...ate is too high then sufficient heat transfer inside may not be occurring Turn the flow through the tap down or fit a suitable flow restrictor and the temperature will increase 3 If Stage 1 and 2 has...

Страница 11: ...oked and require cleaning 3 Carefully check the hot water temperature flow into the mixing valve If it is very hot it may be that the valve needs to be checked replaced A competent installer should ch...

Страница 12: ...m Spares List Part Number Description SUTMIX1 22mm Thermostatic Mixing Valve SUTVESS1 2 Litre Expansion Vessel SUTSTAT1 Cylinder Thermostat SUTSTRAINER1 22mm Y Strainer SUTBALL1 15mm Ballvalve SUTFLOA...

Страница 13: ...monstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference Failure to install and commission this equipment to the manufacturer s ins...

Страница 14: ...have been fitted in compliance with Part L of the Building Regulations Yes Type of control system if applicable Y Plan S Plan Other What is the hot water thermostat set temperature C If fitted what is...

Страница 15: ...e Building Regulations Yes The system has been installed and commissioned in accordance with the manufacturer s instructions Yes The system controls have been demonstrated and understood by the custom...

Страница 16: ...0...

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ...0 Advanced Water Company Unit D5 Enterprise Way Vale Park Evesham Worcestershire WR11 1GS Tel 01386 760066 Fax 01386 760077 Email sales advancedwater co uk...

Отзывы: