Страница 1: ...SUPPORT STOREITCOLD COM 2020 Store It Cold LLC 1 Rev 2020 8A All Rights Reserved WALK IN COOLER MANUAL ...
Страница 2: ...ded manually from the truck IMPORTANT Always consult with your General Contractor before installation of your walk in box in a recently poured concrete pad or tiled floor to ensure enough curing time has been allowed Concrete grout and other construction materials may outgas chemicals for weeks or even months that can cause staining corrosion of walk in cooler metal surfaces Muriatic acid liquid a...
Страница 3: ...nything similar that can cause damage to the inside contents the cooler A small to medium crowbar metal cutting hand snips and a hammer should be used to carefully uncrate your cooler The walk in cooler will be transported and delivered on a commercial LTL delivery truck The receiver will be responsible for providing appropriate access to the delivery vehicle and all necessary man power to safely ...
Страница 4: ... CRATING HOLES CUTS OR ANY OTHER VISIBLE DAMAGE BEFORE IT MOVES INSIDE YOUR LOCATION AND BEFORE YOU SIGN THE RECEIPT IF THERE IS ANY DAMAGE TO THE COOLER YOU ARE RESPONSIBLE FOR NOTING IT ON THE DELIVERY RECEIPT TAKING PICTURES AND NOTIFYING US WITHIN 24HRS AFTER ACCEPTING THE DELIVERY PLEASE DO NOT REFUSE SHIPMENTS YOU ARE REQUIRED TO CONTACT US BEFORE REFUSING A SHIPMENT ...
Страница 5: ... shipment This warranty does not apply to equipment which has been subject to any accident fire negligence alteration damage in transit abuse misuse or improper installation This warranty does not include any labor charge for removal of defective parts or installation of replacement parts or transportation to or from our factory THIS WARRANTY IS EXPRESSLY IMPLIED IN LIEU OF ANY OTHER WARRANTIES EX...
Страница 6: ...hazards in getting an air conditioner A C to do something it was not originally designed to do and that these inherent hazards cannot be ameliorated mitigated or obviated while still maintaining the essential functionality of the CoolBot User accepts all responsibility in the use of and monitoring of the CoolBot Pro and A C User assumes all risk of loss of property or product due to improper funct...
Страница 7: ...INIMMUN RECOMMENDED CLEARANCES FOR WALK IN COOLER INSTALLATION TOOLS NEEDED Level Metal hand snips Power screw driver Hammer or plastic mallet Heavy duty work gloves Safety glasses Tape measure Caulk Gun Utility Knife ALWAYS WEAR GLOVES WHEN MOVING AND HANDLING WALK IN COOLER PANELS ...
Страница 8: ...the small holes on the right side of the panel Insert the Hex Wrench provided with your Installation package and after the panels have been carefully aligned turn approximately of a full turn until panels are securely locked together DO NOT OVERTGHTEN It will strip the Hex hole and damage the mechanism DO NOT drive the Hex Wrench with a hammer as this can damage the lock This locking mechanism is ...
Страница 9: ...UR WALK IN COOLER HAS BEEN PRE ASSEMBLED AT THE FACTORY BEFORE CRATING TO ENSURE PROPER FIT OF ALL PANELS AND TO ENSURE CORRECT DOOR OPERATION 1 Set the floor panels according to the Set up drawing included in your documentation All panels have labels and are identified in the Set up drawing 2 Make sure that all floor panels are level If not using shims under the floor panels around the seams and ...
Страница 10: ...COMPLETELY LEVEL FRONT TO BACK AND LEFT TO RIGHT Begin with two corner panels Usually the left back corner is a good place to start Make sure that the top of each wall adjacent panel is flush with each other Use the wrench to secure the wall panels to the floor and then lock the wall panels together to start the wall Check for alignment to make sure the panels are flush with the floor corners and ...
Страница 11: ...he adjacent panels and floor 6 Repeat this procedure with each wall panel working your way around the perimeter of the cooler in a clockwise fashion 7 When installing the Door panel DO NOT REMOVE THE DOOR FROM DOOR FRAME Cut the shipping metal band at the bottom of the door panel with a pair of metal snips Follow the same recommendations as when installing the wall panels Door frame panel must be ...
Страница 12: ...f doorway Frame legs are parallel and not spread out Opening width at bottom of doorway to match width at top of doorway On coolers with a floor ensure the door panel cam locks are locking correctly with the floor ones when engaged Verify function of door door locks and emergency release when door is locked Adjust door closer if needed 8 Proceed to install the rest of the wall panels in the same w...
Страница 13: ...ck around your box to make sure all surfaces are flush and the top edges of the walls are all level 10 Select the first ceiling panel from your Set up drawing and place it on the corresponding side of the cooler indicated in the drawing Ensure that it sits properly on all the tongue and groove edges and that it is flush with the corners and walls on the outside ...
Страница 14: ... wall panels using the Hex Wrench 12 Proceed with the next adjacent ceiling panel marked in your drawing making sure that it sits properly on all the tongue and groove edges and that it is flush with the corners and walls on the outside Lock the panel to the adjacent panel first and then lock the panel to the walls ...
Страница 15: ... your door for correct operation Open your door less than 90 and let it close by itself Make sure it closes freely and makes a good seal with the frame Ensure the door does not hit or rub against any parts of the frame A door that is not closing properly is usually the result of unlevel set up and or improper installation Please unlock the necessary panels and correct positioning and leveling unti...
Страница 16: ...nstallation kit Use a plastic or regular hammer to gently tap them in place If the plastic button is falling because the hole was bored a bit bigger you can use a small amount of silicone on the back of the button to keep the plastic cover in place 16 Enclosure Set up finished 17 Last Steps on pages 17 coolers with floor 18 coolers with no floor ...
Страница 17: ... with NO floor will NOT have a threshold Across the bottom of each door opening is a stainless steel threshold Secure the threshold by using self drilling metal screws and by screwing them into the floor panel illustration 1 Some thresholds may overhang in a 90 angle to the front Ensure you fasten that side as well to the front side of the floor panel illustration 2 ...
Страница 18: ... Install anchoring brackets ONLY after the door has been checked for correct operation and door frame has been confirmed to be level and plumbed Your cooler with no floor includes the following hardware to anchor your door frame to the floor inside 2 Angle pieces 16 gauge clips with 1 4 pre drilled hole 8 Anchors 3 16 x 1 3 4 Hex washer head Tapcon ...
Страница 19: ... been pre cut at the factory to match the layout of your cooler If you have to cut a piece of screeding you can use a miter saw or a hand saw A piece numbered 0 may be included as an extra piece 1 Use a chalk line to mark the installation area to the dimensions of the walk in as shown in the drawing Figure 1 Measure diagonally from corner to corner to be sure the floor vinyl screed is square 2 App...
Страница 20: ...ed If they are not loose the cam locks shim as necessary adjust and lock again until they are level and flush at the top You can also install small shims as necessary under vinyl screed corners or across the panel as needed to ensure levelness of panels and walls across the top 5 Select the next adjacent wall panel going in a clockwise direction around the perimeter and follow the same steps as ab...
Страница 21: ...s door face at bottom of doorway Frame legs are to be parallel and not spread out Opening width at bottom of doorway to match width at top of doorway After all walls are installed verify function of door door locks and emergency release when door is locked Adjust door closer if needed Verify that door sweep lightly drags on floor when opening closing door IMPORTANT Door and frames have been checke...
Страница 22: ...All Rights Reserved 7 After installing the door follow the rest of the steps as mentioned in INSTALLATION OF A WALK IN WITH FLOOR OPTION from step 8 inclusive through 16 8 Please make sure to read the instructions on SECURING THE DOOR PANEL TO THE FLOOR on page 18 ...
Страница 23: ... go through the side walls on outdoor coolers Install the A C hood before your roof membrane Included items of your outdoor package 1 A C hood 2 Door cap rain gutter 3 Roof Membrane pre cut about 1 ft larger on each side 4 Membrane Trim Flat bars 5 Installation Hardware a black long screws For Truss Plate anchors and for Trim b S S or hex sheet metal screws For A C hood c Truss Plates only to be u...
Страница 24: ...ed to the outside a door cap to prevent rain water from running down into the door gasket is provided The cap should be attached with sheet metal screws to the frame above the door at a slight angle to allow water to drain quickly towards the hinged side of the door see Fig below Caulk the joint with sealant butyl or silicone between cap and wall to prevent leaks See Fig ...
Страница 25: ...by installing the trimming provided Screw the trimming to the front side using the screws provided in your installation kit IMPORTANT Make sure the trim is level and below the seam in between the wall panel and the ceiling panel It s important that this seam stays under the membrane 3 Repeat the same process for the back side of the cooler making sure your membrane is pulled taut towards the back ...
Страница 26: ...ng seams DOWN Ensure that it hangs approximately the same amount on all sides You should have the membrane hanging at least a 6 on each side of the cooler Don t worry if it is too long it can be trimmed after it s installed in place 2 Find the tabs seams on your membrane and ensure they are running parallel to one side and at least 6 away from the closest edge of the cooler and that they are runni...
Страница 27: ...as the first one Remember once the membrane is rolled completely the Tab will be covered and no anchors or screws will be visible from the top 7 Continue the same way installing horizontal rows of anchors in to every Fastening Tab making sure your membrane is pulled tight each time 8 Starting at the front of the cooler pull down on the membrane and secure to the wall by installing the trimming pro...
Страница 28: ...the trimming bars for added protection 13 Your cooler is now set up for outdoor use A C INSTALLATION INTRUCTIONS This is a quick simple guide to install your LG unit in your Cooler enclosure Please read the LG OWNER S MANUAL supplied with your A C unit to familiarize yourself with the operation of your LG air conditioner unit 1 Carefully unpack your A C unit out of the box Make sure the A C unit r...
Страница 29: ...lly insert the A C cabinet on the pre cut hole from the inside of the cooler and slide towards the outside until the top bracket of the cabinet touches the wall panel 6 Ensure that the cabinet has a slight tilt downward towards the outside Position the cabinet so that the back is about to 1 lower than the front Use the holes at the bottom of your A C cabinet to screw in place to the edge of the pr...
Страница 30: ...e condensation around the A C inside the cooler a better alternative to the foam strips included with the A C is to use closed cell pipe insulation available at hardware stores looks like black a pool noodle and cut it in 2 strips longways Insert the strips into the gaps all around the opening and the A C to seal the space Repeat on the outside DO NOT USE SPRAY FOAM TO SEAL IN BETWEEN THE A C ENCL...
Страница 31: ...lets from the factory Drilling holes on the panels to run conduit to bring power inside the cooler is OK and will not void the warranty of your panels as long as the installation is done by a qualified electrician All OUTLET BOXES and JUNCTION BOXES installed should be surface mount On outdoor coolers electrical installations should be done ONLY AFTER your outdoor membrane has been installed Make ...
Страница 32: ... panel seams or locking devices see figure below REQUIERED ELECTRICAL AND CONNECTIONS COOLERS WITH ONE 15K BTUs AIR CONDITIONER OR SMALLER A dedicated 120V 15 amp circuit required The electrician will have to install o One 120V surface mount outlet box to plug in the CoolBot Controller and the A C inside the cooler on the right side of the A C o One 120V supply via conduit to the front light atop ...
Страница 33: ...the front light atop the door to provide power to the light and the factory pre wired light switch see page 34 A C plug configuration 18K BTU COOLERS WITH ONE 24K BTUs AIR CONDITIONER A dedicated 208 240V 20 amp circuit required A dedicated 120V 15 amp circuit required The electrician will have to install o One 208 240V surface mount outlet box to plug in the A C inside the cooler on the right sid...
Страница 34: ...nel ATTENTION ELECTRICIAN The only connection you have to do at the door is at the light fixture Bring 120V supply through the ceiling or wall via conduit into the light fixture Connect inside the box to the white black and ground cables Wiring diagram of the door and light connection on next page for reference ...
Страница 35: ...r Your Cooler Switch thermometer and light fixture have been PRE WIRED at the factory The ONLY connection needed on the front of the cooler is a 120V supply line Hot Neutral Ground at the light fixture The light fixture serves as a junction box Once appropriate 120V power has been provided to the light fixture junction box your light switch and thermometer should work No extra wiring is needed ...
Страница 36: ...tery not necessary for operation Hot H1 H2 room temperature is above 75 F OFF temperature probe is not connected install re check connection or replace temp probe on the back of the controller Small dots on the display during normal operation Far left light above temperature is the battery indicator if a 12V is installed The next two indicate either degrees F or C in the order left to right COOLBO...
Страница 37: ...Energy Saver mode on the A C unit instead of Cool Mode OR you can try using the A C on the Cool Mode but with the Fan speed set on Medium Adding buckets of water will also increase the humidity on your room If needed install a hygrometer to keep track of the RH level in your room 2 ROUTINE CLEANING OF ENCLOSURE Wipe panels with a damp cloth using mild soap DO NOT use harsh chemicals or abrasive pa...
Страница 38: ...the wall and placing it on a working bench Caution should always be used when cleaning A Cs as to not splash any water in its electronic components or use the wrong type of cleaners Use common sense If using a professional Coil Cleaner available at most hardware stores please follow the manufacturer s recommendations Watch Video on Cleaning the Inside Fins of Your A C 4 PERIODIC INSPECTIONS Inspec...