background image

2

Equipment List

Speed Wrench

22#.23#.24#

Hammer (30lb)

Rope (12#)

Long Tape (50m)

Hammer Drill*1

Lifter*2

Crane*1

Forklift*1

Protective

equipment

Содержание EWC3340DTPR

Страница 1: ...1 Universal End Wall Model EWC3340DTPR Assembly Instructions End Wall for Double Truss Shipping Container Roof 33 x40 x12...

Страница 2: ...2 Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment...

Страница 3: ...and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected...

Страница 4: ...steel into the hole making sure 3ft is below the surface completely laying on the side of the containers 3 Weld the square steel to the 2 containers 4 Pour cement in the holes to make sure the square...

Страница 5: ...of Single truss framing Customer responsibility 4 It s the owner s responsibility to shovel snow off the canopy rooftop 5 All containers need to be anchored to the ground in each opposite corner sides...

Страница 6: ...welded with door track and pully 1 25 connection plate for post 1 1 pcs set 4 sets 26 cross beam 2pcs set 1 set 27 vertical rod 1 28 rail 2 29 rail 4 30 side square tube left right with velcro 2 31 s...

Страница 7: ...ction plate 15 41 bolt M8x70 for rail 2 42 bolt M6x40 for door bracing tube No 35 No 36 5 43 expansion bolt 8 44 cable tie 50 45 rope for front cover 4 bundles 1 pack 46 steel wire 1 bundle 1 bundle 4...

Страница 8: ...8 FRAME INSTALLATION Installation for End Wall Basing on 40ft standard container 8 6 high Winch door size 14 1 W x 13 3 H...

Страница 9: ...9 Installation for End Wall Basing on 40ft high cube container 9 6 high Winch door size 14 1 W x 14 3 H...

Страница 10: ...10 WINCH DOOR INSTALLATION...

Страница 11: ...11 1 Install the front door frame and door winch bracket 2 Fix the winch to the bracket Make sure the winch handle faces the outside Refer to Figure 1...

Страница 12: ...ection The side with pipe pockets faces inward 4 Connect the door bracing tube 2pcs set with M6x40 bolt 5 Thread the door bracing tube into the pocket from top to bottom Pay attention to the bottom br...

Страница 13: ...rame and on the same plane as the pulley and then the steel wire rope sags naturally Keep the length of both sides equal and naturally sag to the ground 7 Fix each end of steel wire rope to the hole o...

Страница 14: ...14 9 Adjust the length of the steel wire rope to be equal on both sides Fix the wire rope fold to the hole in the winch Refer to Figure 4 4...

Страница 15: ...10 Turn the winch clockwise to lift the door curtain cloth and bracing tubes to a position about 40 50cm away from the cross beam Lace the eyelets on the cloth to cross beam with a rope Refer to Figur...

Страница 16: ...he winch door installation is completed Turn the winch clockwise to raise and counterclockwise to lower the door The steel wire rope shall be evenly wound on the winch so that the door can rise and fa...

Страница 17: ...COVER INSTALLATION Installation for End Wall Basing on 40ft standard container 8 6 high Winch door size 14 1 W x 13 3 H Note Need to put the bottom bracing tube No 36 into the second last row of pock...

Страница 18: ...stallation for End Wall Basing on 40ft high cube container 2 9m 9 6 high Winch door size 14 1 W x 14 3 H Note Need to put the bottom bracing tube No 36 into the bottom pocket Now your assembly is comp...

Отзывы: