8
INSTALLATION PROCESS
Note: Make sure to fix the container firmly before installing the shelter.
A—BASE PLATES INSTALLATION
Please refer to the diagram (Figure 1) to mark the position of base plates
Figure 1
1. The measurement is done as the above figure 1 showing. Referring to the above diagram and
confirm the place of base plates. ENSURE THAT THE FOUNDATION IS SQUARE.
2. The Four corners base plate (No.7) and the middle base plate (No.8) are welded on the top of
container.