2. When finish installing all arches, lift the arch to top of containers, and then adjust the distance
between arches. Weld the base plate to container firmly.
3. Install Purlin (No.5) by Carriage Bolt M10x80 (No.12) and then the third arch and Purlins. In this turn,
one arch and then purlin tubes.
4. Install Steel Wire (No.21) between arches by Tube Clip (No.10), Connection Plate (No.6), Turnbuckle
(No.19) and Steel Wire Clamp (No.20).
IMPORTANT: THE WIDTH OF ARCHES SHOULD BE ADJUSTED BEFORE LIFTING.
C—COVER INSTALLATION
NOTE: DO NOT install the cover onto the frame of your building in high wind conditions. A slight breeze
is the most advantageous for cover installation. To take advantage of the breeze, pull the cover up over
the arches with the breeze blowing in the cover like a sail filled with air.
1. Roll out the roof cover on a ground sheet. Align the cover evenly to each end of the frame. Be sure
doing not over pull the end of the roof cover.
2. Insert the Tensioning Tubes (No.9) into the cover pipe pockets. Pull the cover over the frame
EVENLY, CAREFULLY AND SLOWLY. Cut openings on the pocket above the corresponding base plate
and loosely secure the Belt (No.14) in the Winch (being installed on base plates). DO NOT TIGHTEN.
Adjust the cover so that it is square and evenly centered on the frame.
Note: The end flaps must overhang evenly at both ends.
3. Use Rope (No.15) to tighten roof cover to end arches. Rope should be cut as your requirements
when using. When the cover is tidy and ready, drive the winch tie down forth and back and then
roof cover is tightened. Pull the band inside the roof cover (four corners) by Winch on base plate
(No.7).
Note: if there is damage for cover when use, please repair it as soon as possible to avoid
further damage.