6
3.
After installing the first two arches, connect the
Connection purlin
(part code 5)
onto them using the
Bolts M12x110
(part code 8). There are 7 pieces of
Connection
purlins
(part code 5) between each arch.
4.
Install the Inclined
Support tube
(part code 6) using
Clip for Inclined Support Tube
(part code 7). Assemble the frame by turns like this.
Figure 4
5.
Then install the third arch into the base plate and connect the purlins.
6.
Assemble the arches one by one until the frame is finished.