The StoneFly USO-HA comes in Dual 1U, Dual 2U or Dual 3U Storage Concentrator Clus-
ter. There are several stages to setting up the StoneFly USO-HA™ Appliance.
Environmental
: Requirements for power and network availability must be taken into con-
sideration when planning where to place your Storage Concentrator. The space should
have well regulated temperature and humidity and should be relatively free of dust and
other contaminants.
Step 1: Mounting Rails Installation
Mounting rails should be installed on any units requiring them. The Storage Array User
Guide includes specific instructions on how to make the attachments. Place all the equip-
ment in its operational environment.
A simple configuration is 7U high comprising two SC’s and one Storage Array. Note that
the SAS cables connecting the Storage Arrays and the Expansion Units are short. The
length of the cables dictates these units must be rack mounted very close to each other. If
more Expansion Units will be added later it is best to allow room for them at the initial
installation of the USO-HA.
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door complete-
ly.
• Leave approximately 30 inches of clearance in the back of the rack to allow for sufficient
airflow and ease in servicing.
• This product is for installation only in a Restricted Access Location (dedicated equipment
rooms, service closets and the like).
Getting Started
USO-HA
Quick Start Guide
5
Содержание USO-HA
Страница 1: ...Quick Start Guide STONEFLY USO HA Cluster High Availability HyperConverged Appliance...
Страница 17: ...USO HA Quick Start Guide 14 Figure 9 Storage Array Expansion Connection...
Страница 25: ...StoneFly Inc 26250 Eden Landing Rd Hayward CA 94545 510 265 1122 support StoneFly com www StoneFly com...