![Stone Age SA-24PS Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/stone-age/sa-24ps/sa-24ps_installation-and-operation-instructions-manual_1382035006.webp)
6
F. Install the tapered front and rear throat pieces
(8). See Figure 12.
G. Patio Series kits include 2 chimney sections.
A maximum of four additional feet of chimney is
recommended with the Patio Series fireplaces.
Install the first Stone Age masonry chimney section
(9A), with the tile extending upward. Fill the void
on the bottom with mortar to create a smooth transi-
tion. See Figure 13.
H. Install the next chimney section (9A), or any
additional chimney sections to be installed. Fully
bed each piece in mortar, and filling in the gap
between the clay tiles in each section. Parge the
joints to create a smooth transition between each
chimney section. Note that if a tile is chipped or
slightly out of square, it may be used as long as it the
joints are filled and smoothed with high temperature
mortar. See Figure 14.
This model is designed for outdoor use only, and
should not be placed near a structure or covered
area. A minimum of 8’ horizontal clearance to a
structure or covered area is recommended.
3.3 Exterior finishing
The exterior of the fireplace may be finished in any
masonry-compatible material. Mantle and exterior
veneers may be fabricated stone, thin veneer or full
bed depth natural stone, tile, brick or stucco.
If the exterior finish will be stucco, stain, tile or manu-
factured thin stone, wrap the outside of the firebox
with metal lathe. Attach metal lathe to the firebox us-
ing concrete nails, tapcons, masonry or concrete an-
chors. Natural stone veneers (whether full bed depth
or thin veneer), full size brick, concrete pavers, CMU
block, etc., do not require metal lathe. Ensure the
8
8
9A
Figure 13. Chimney Flue
Figure 12. Throat Pieces
9A
Figure 14. Chimney Complete
Содержание SA-24PS
Страница 11: ...11...