background image

                                                               
    

 

5

 
to suitable isolating valves be incorporated between each individual item of equipment and the 
system. In addition, drain cocks must be fitted to enable each individual piece of equipment to be 
drained down independently from the main system. 
 
4)  

Connect a switched fused single phase mains supply at 240volt 1 phase 50hz to the terminals 

in the control section of the unit (fused at 13amps). 
 
5)  

Electrical connections will be required to the fault / indication circuits as shown on the wiring 

diagram, to which references should be made depending on the option to which the equipment has 
been supplied. 
 
All units incorporate a set of volt-free contacts to shut down the burner/chiller on pressure alarm, and 
these should be linked into the control circuit, so as to shut down the burner/chiller in the event of an 
alarm condition. It is important, however, that the supply to the EP unit is maintained under all 
conditions. 
 

Unit. 

 
External pipe work connected to the unit should be supported so as not to stress the pipe work 
connections. Any parts removed for transit must be refitted. 
 
The above in conjunction with the drawings should enable the unit to be installed ready for 
commissioning, however, if you require advice or assistance please do not hesitate to ask out 
technical support staff for guidance. 
 
If Stokvis are commissioning, please ensure that all of the electrical, water and other connections are 
intact, and that power and water are available before calling us to site. This will save unnecessary 
journeys, delays and expense. 
 

Commissioning. 

 
Before commencing the commissioning procedures detailed below, ensure that the system is full, 
and has been vented by using a temporary connection.  
 
This unit is 

NOT

 designed for initial system filling, due to its limited flow capacity, but a quick fill 

bypass loop is available, and can be supplied (at additional cost) if required. 
 
Ensure that the unit break tank is full to the waterline. Prime the pump by removing the plug at the 
top of the pump body, and allowing water to flood through. When all air has been expelled, replace 
plug. 
 
Check that the pre-charge pressures in both the unit pressure vessel and the system expansion 
vessel (s) are correct.  
 
This check must be carried out with 

NO

 water in vessels. 

 
 
 
 
 
 
 
 

Содержание ECONOPRESS EP 1

Страница 1: ...G UNITS INCLUDING H P UNITS OPERATING AND MAINTENANCE INSTRUCTIONS STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL 08707 707 747 FAX 08707 707 767 E MAIL info stokvisboilers com...

Страница 2: ...2 Contents Contents 2 General Description 3 Storage 4 Installation 4 Unit 5 Commissioning 5 Maintenance 7 Spare and service 8 General data Error Bookmark not defined...

Страница 3: ...ressure the standby pump EP 2 units will start as the pressure falls further If the pressure within the system goes beyond preset design limits then the system pressure alarm switches will become acti...

Страница 4: ...ther on a smooth level surface or alternatively back fixed to a suitable wall or other vertical structure in areas which are dry well ventilated and free from any danger from frost Once the unit has b...

Страница 5: ...ctions Any parts removed for transit must be refitted The above in conjunction with the drawings should enable the unit to be installed ready for commissioning however if you require advice or assista...

Страница 6: ...al switch on at low pressure the standby pump will run to cut out pressure and stop whereupon the duty pump will start and run to its cut out pressure On falling pressure the duty pump will start at i...

Страница 7: ...p as indicated by the unit gauge Check that the switch resets before cold fill pressure is reached Close the valve between the unit and system and expansion vessels Run the pump raising the pressure a...

Страница 8: ...records of all units supplied General data EP1 EP1HP EP2 EP2HP FACTORY SETTINGS Duty pump cut in pressure 2 5 BAR 6 BAR 2 5 BAR 6 BAR Standby pump cut in pressure N A N A 2 3 BAR 5 8 BAR SE vessel pre...

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Отзывы: