Instructions for the installer
Condensate drain
During the combustion process, the boiler generates condensate that
flo
ws into the drain trap through pipe “A”.
Th
e condensate that forms inside the boiler must
flo
w into a suitable
drain from pipe “B”.
Danger!
Before commissioning the appliance:
- check correct assembly of the drain trap
- fill the drain trap from the filler cap “C” and check
the correct draining of condensate
If the appliance is used with an empty condensate
drain trap the danger of poisoning subsists following
a flue gas leak.
Th
e top generator of the drain
pipe must not be higher than
the bottom of the pan
TO THE
CONDENSATION
DRAIN
FLOOR OF
THE H.C.U.
FRONT SIDE
Th
e condensate drain pipe outlet is set up towards the connection
side of the
fl
ue box manifold, removing the pre-sectioned part on the
cover panel.
*
Minimum safety trap enforced by regulation
**
Minimum head with boiler operating at maximum power.
Connection between the appliance and the domestic
wastewater disposal system must be carried out in
compliance with the spe
cific r
egulations of reference.
If you do not want to or are able to create a platform,
it is possible to install the boiler on the
flo
or and set
up the trap at a depth of 100 mm.
Содержание ARES Tec 150
Страница 1: ...5 6 7HF QVWDOODWLRQ 2SHUDWLRQ 0DLQWHQDQFH 0DQXDO...
Страница 2: ...2 ARES Tec 150 350...
Страница 26: ...Instructions for the installer 3 13 CoMpLETE opTIoNAL SAFETY KITS 150KW 350KW LLH KIT 150KW 350KW PHE KIT...
Страница 27: ...Instructions for the installer 3 13 CoMpLETE opTIoNAL SAFETY KITS...