STM ROCKETBOX Скачать руководство пользователя страница 5

 

4 | 

P a g e                            

 

 

 

        © 2 0 1 9   s t m   c a n n a   v 1 . 6

 

 

 

STM ROCKETBOX 

Technical Specifications 

Materials 

Encased in SAE 304 Stainless Steel 

Heavy Duty Caster Wheels (for Transport) 

Aluminum & Other Food-Grade Components 

Safety & Compliance 

OSHA Compliant 

UL-Listed Components 

100% Food Grade (Clean & Safe to Use) 

Safety Lock & Emergency Stop Button 

Weight 

Dimensions 

Approx. 350 LBS 

Machine Dimensions 17" L x 48" H x 27" W 

---- 40" W with Control Panel Arm

 

Building & Assembly 

100% In-House Design, Building & Assembly 

Warranty 

1-Year Parts & Labor Warranty 

Power 

Standard 110v Power | 21 Amps | 2310 Watts  

7847.9257559 BTU | 5-1/2 ft. Cord Length 

Seek Certified Electrician for Installation Needs 

Shelf-Life 

10 Years or 8,000 Hours 

Paper Compatibility 

Compatible with Industry Standard King size 1 gram, 1-1/4 Size for 

½

 gram cones 

Volume Capacity 

453 Pre-Rolled Joints Per Run 

Product Loss During Use 

Minimal Material Lost during Operation.  Excess can be Re-Collected and Re-Used 

from Top Tray & Bottom of Machine.  All Parts of the RocketBox are Food Grade or 

Powder Coated Food Grade. 

Weight Variance 

Variance Range Within .05g  

Falls Within Health Canada’s 5% +/- Rule 

Operation 

Pneumatic Leveling System 

(Cones Remain Suspended in Air Inside 

Machine as to Not Damage or Bend the Filters

Software & Hardware 

Ergonomic 4.3

 Capacitive Touch Control Panel 

With STM Upgradable System Software 

Cycle Customization 

3 Customizable Stages Per Cycle 

1. Filling – 2. Packing – 3. Final Pack/Dampening 

 (All Setting are 100% Adjustable: Motor Power, PSI, and Timing) 

Profiles & Presets 

Manual Mode OR 10+ Customizable Presets 

Содержание ROCKETBOX

Страница 1: ...0 P a g e 2 0 1 9 s t m c a n n a v 1 6 ROCKETBOX INSTRUCTION MANUAL Sesh Technologies Manufacturing LLC Tech Deliveries 509 204 3148 www stmcanna com...

Страница 2: ...G ON THE ROCKETBOX PAGE 7 TOUCH SCREEN OPERATION PAGE 8 TOUCH SCREEN ICONS PAGE 9 USING TOUCH SCREEN MODES AUTOMATIC MODE PAGE 10 USING TOUCH SCREEN MODES MANUAL MODE PAGE 11 USING TOUCH SCREEN MODES...

Страница 3: ...be visually inspected for debris Although we inspect each and every part before it is sent due to the intense vibration the break in period is required for all new hardware and plates to wear off the...

Страница 4: ...ted to loading cones into empty bottom trays o ROCKETBOX AREA for trained person s to operate the RocketBox o CLOSING PACKAGING AREA dedicated to final processes of closing cones and packaging them Su...

Страница 5: ...or 8 000 Hours Paper Compatibility Compatible with Industry Standard King size 1 gram 1 1 4 Size for gram cones Volume Capacity 453 Pre Rolled Joints Per Run Product Loss During Use Minimal Material L...

Страница 6: ...Use the nuts at the top of the feet to adjust and level it Step 4 Insert the bottom tray into Loading Box LOADING UNLOADING CONES LOADING CONES Step 1 When loading cones push in the knob on the right...

Страница 7: ...rgency you can push in the E STOP button to quickly shut down the machine GOOD PRACTICES Pre weigh your material with an overfill of 20 30 prior to cycle Consistency should match that of a personal ha...

Страница 8: ...g for a specific period of time You have complete control over every setting ___________________________________________________________________________ Each Stage Can Be Customized By Desired power o...

Страница 9: ...This section has functions that control the power of the shaking motor and the pneumatic leveling system HOUSE ICON MAIN HOME SCREEN The HOUSE icon is for the main home screen This is the main home sc...

Страница 10: ...mple This is the 3 Stage Automatic Preset Mode Detailed on Page 6 Step 1 Click on the Gears Icon Step 2 Click on 1 Sample mode This is the default 3 stage mode Step 3 Click on the Gear Icon again to s...

Страница 11: ...he pneumatic leveling system The higher the PSI number the tighter the pack We recommend starting at 80 PSI The right side settings adjust the motor speed which controls the amount of vibration The hi...

Страница 12: ...Stage 2 could be a harder pack at a higher motor speed for 20 seconds Then Stage 3 a lower motor speed for a dampening pack Step 4 Click Back Arrow Step 5 On Preset Screen click on a Number to store...

Страница 13: ...and to 20 PSI before adding any material You can add material before or after you press the go button depending on what your pre set functions are Eventually you can turn it up to 80 PSI to get a goo...

Страница 14: ...each end of the trays Step 4 Load tray into loading unloading station REMOVING FINAL PRODUCT Step 1 Ensure the loading box is in the unloading position black knob on side is pulled out prior to placi...

Страница 15: ...ng regular soap and water and rinsing off removing all residue To clean stainless steel use isopropyl alcohol and a soft cloth Wet the rag with the isopropyl alcohol and wipe down all areas thoroughly...

Страница 16: ...paperclip to unplug the holes as it fills It also helps to sometimes loosen each handle on the top tray to get more vibration during use How do I get a better fill rate Fill rate will depend on a vari...

Страница 17: ...through a dealer distributor not authorized for your country will not be supported by this warranty Electrical parts are not covered under warranty Extent of Warranty Any STM system properly returned...

Страница 18: ...erviced accordingly where the shipment date may be sooner than originally quoted We will ship by the most reasonable means based on the volume of the order unless otherwise specified Special Orders Al...

Страница 19: ...will need to place in and on the package After receiving your RMA you may send the item to STM 3223 North Market St Spokane WA 99207 Upon receipt of the returned product we will fully examine it and n...

Страница 20: ...19 P a g e 2 0 1 9 s t m c a n n a v 1 6 NOTES...

Отзывы: