State: 06.10.2020 p. 2
Mounting instructions slide for toddlers „Tammy“
Item-No. 51 3553 601
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 3).
Note:
Due to possible overheating, do not place the slide surface southernly.
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made
on the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundations as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The slide is installed at play level. Pay attention to items marked „play
level“ at play equipment!
4. Set up the concrete foundations according to diagram 2 with central, horizon-
tal reinforcement. Insert the foundation anchor of the slide into the concrete
mass as shown in diagram 4.
5. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation.
6. Clean the surface of the foundations. Add the hexagon on the posts with the
screws included and place it on the foundation.
Note: Do not screw the base plate of the post to the foundation yet!
7. Screw the slide and ladder to the hexagon as shown using the screws inclu-
ded in the delivery.
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25
R100
R100
500
300
1843
2781
450
100
840
2344
A
A
1000
300
490
700
150
500
300
952
250
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Tammy
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:25
A3
Name
Name
Fundamentplan
1231-00-00
Maßstab
Schramm
19.10.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
B stoßdämpfender Boden
02.10.20 ES
SI
11.10.18
Rutschenfundament hinzu
A
Datum
Änderung
Rev
Diagram 2: Foundation plan
Play level