background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

State: 26.11.2020 p.  3

Mounting instructions for multiplay „gravis 1D“

Item-No. 51 5519 403

Diagram 3: Foundation plan

400

450

3324

1462

4816

A

A

3862

800

600

600

6593

600

1930

4583

4262

281

30°

30°

2418

488

2685

1030

1785

243

1578

  800 

 1270 

 2870 

 1000 

  600 

 650 

 578 

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

gravis 1D

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:40

A3

Name

Name

Fundamentplan

1004-00-00

Maßstab

Mattheis

31.10.16

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

C stoßd.Boden/ retis Fundam. 20.08.20 ES
B retis Fundament näher

17.07.19 SI

SI

29.10.18

retis Fundament angepasst

A

Datum

Änderung

Rev

6.  Clean the foundation surface. Connect the platform to the posts according 

to diagram 1, 4a and 4b and fix the parts using the screws including in the 

delivery.

7.  The posts of the tower have to be positioned on the foundations as shown 

in diagram 1 and 3. Make sure that the ports for the wobbel bridge faces the 
climbing wall. 

Note: Do not screw the base plates onto the foundations yet!

       

8.  Positioning of the climbing wall as shown in diagram 1 and 3 onto the founda-

tion. Screw it to the two support tubes. 

Note: Safe the climbing wall during the whole construction of the multi-

play equipment against overturning.

9. 

Connect the wobbel bridge as shown in digram 1, 5c and 6b at the flabs on 
the tower and the climbing wall and fix it with the shackles included in the 

delivery.

                             

10. Connect the slide (diagram 5b) with the tower at the intended locations and 

fasten it with the screws included.        

11.  Connect the climbing net (diagram 5a) with the tower at the intended lo-

cations acc. to diagram 1 and 6b and place the foundation plate on top of 
the foundation. Please fasten the parts using the shackles including in the 
delivery.

12. Align the play equipment once more on the foundations. The wobbel bridge 

should not be sagging. 

Note:

 The climbing net should be placed with tension to avoid droop.

13. Drill holes into all foundations and screw the play equipment to the founda-

tions using the included heavy-duty dowels.

Play level

Отзывы: