© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved
State: 26.11.2020 p. 3
Mounting instructions for multiplay „gravis 1D“
Item-No. 51 5519 403
Diagram 3: Foundation plan
400
450
3324
1462
4816
A
A
3862
800
600
600
6593
600
1930
4583
4262
281
30°
30°
2418
488
2685
1030
1785
243
1578
800
1270
2870
1000
600
650
578
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
gravis 1D
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:40
A3
Name
Name
Fundamentplan
1004-00-00
Maßstab
Mattheis
31.10.16
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
C stoßd.Boden/ retis Fundam. 20.08.20 ES
B retis Fundament näher
17.07.19 SI
SI
29.10.18
retis Fundament angepasst
A
Datum
Änderung
Rev
6. Clean the foundation surface. Connect the platform to the posts according
to diagram 1, 4a and 4b and fix the parts using the screws including in the
delivery.
7. The posts of the tower have to be positioned on the foundations as shown
in diagram 1 and 3. Make sure that the ports for the wobbel bridge faces the
climbing wall.
Note: Do not screw the base plates onto the foundations yet!
8. Positioning of the climbing wall as shown in diagram 1 and 3 onto the founda-
tion. Screw it to the two support tubes.
Note: Safe the climbing wall during the whole construction of the multi-
play equipment against overturning.
9.
Connect the wobbel bridge as shown in digram 1, 5c and 6b at the flabs on
the tower and the climbing wall and fix it with the shackles included in the
delivery.
10. Connect the slide (diagram 5b) with the tower at the intended locations and
fasten it with the screws included.
11. Connect the climbing net (diagram 5a) with the tower at the intended lo-
cations acc. to diagram 1 and 6b and place the foundation plate on top of
the foundation. Please fasten the parts using the shackles including in the
delivery.
12. Align the play equipment once more on the foundations. The wobbel bridge
should not be sagging.
Note:
The climbing net should be placed with tension to avoid droop.
13. Drill holes into all foundations and screw the play equipment to the founda-
tions using the included heavy-duty dowels.
Play level