background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

State: 26.11.2020 p.  2

Mounting instructions for multiplay „gravis 1D“

Item-No. 51 5519 403

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 2). 

Note: 

Due to possible overheating, do not place the slide surface southernly.

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for foundations as shown in diagram 3. After exca-

vation compress the foundation floor.

 

Note: 

The play equipment is installed at play level. Pay attention to items 

marked „play level“ at play equipment!   

4.  Set up the foundations according to diagram 3 with central, horizontal rein-

forcement.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

Diagram 2: Top view

Reinforcement plan:

Concrete foundation with reinforcement
Foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 25/30

 R1000 

 R1000 

 2000 

 R1500 

 2630 

 1500 

 R1500 

 R1500 

 8450 

 1501 

 8860 

 7500 

 4000 

 7250 

 5500 

 2000 

 5000 

mind. Fallschutzplatten

min. required safety slabs

Aufprallfläche

impact area

Fallschutzplatten

required safety slabs

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

gravis 1D

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

Rev

Änderung

Datum

1:50

A3

Name

Name

Draufsicht

1004-00-00

Maßstab

Behnke

31.10-2016

 

 

A Fallraum vergrößert

16.10.18 SI

ES

01.09.20

Fallraum geändert

B

ES

01.10.20

Fallraum geändert

C

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Отзывы: