© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • Alle Rechte und Produktmodifikationen vorbehalten
State: 30.03.2017 p. 4
Mounting instructions robinia wendy house „brevi“
Item-No. 51 8020 601
5.
Connect the roof at the intended locations acc. to the Diagram 1 and 4. with
the robinia poles. Please fasten the parts using the screws including in the
delivery.
6.
Place the pre-assembled play house as shown in the overview and in the
Diagram 3a and 3b on the main foundation and do a rough aligning.
Then place the sliderule, the base plateof the mirror hemisphere and the flo
-
wer bench related to the play house as shown in diagram 3b. Keep attention
to the distance of the egdes of the foundations.
7.
Drill holes into all foundations and screw the play equipment into the founda
-
tions with the included heavy-duty dowels.
8. Seal the foundation with the safety cover required for the height of fall
indicated.
Critical drop height: 0 mm.
Recommended surface material:
grass
synth. fall protection (We recommend our playpoint base with a diameter of
3,80 m, to be ordered separately)
concrete surface (The ground should be smooth and free of edges.)
9.
Align the mirror hemisphere on top of the safety cover in the center of the
play house and put the cover ring on the mirror hemisphere. Please fasten
the parts at the base plate, using the screws including in the delivery.
10.
After 3 months, check the screws at the joints and retighten them if
necessary.
Diagram 4: assembly of the roof and robinia poles