State: 04.12.2020 p. 2
Mounting instructions for multiplay „ascendo 2 robinia“
Item-No. 51 7510 601
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 2).
Note:
Due to possible overheating, do not place the slide surface southernly.
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made
on the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundations as shown in diagram 3. After
excavation compress the foundation floor.
Note:
The combination equipment is installed at play level. Pay attention to
items marked „play level” at play equipment!
4. Set up the concrete foundations according to diagram 3 with central, horizon-
tal reinforcement.
5. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation.
6. Clean the surface of the foundations and start with the installation of the play
equipment.
Diagram 2:Top view
Reinforcement plan:
Concrete foundation with reinforcement
Foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25-C25/30
2000
R1500
R1500
R1000
2630
1504
1504
8400
1500
R1500
R1500
1538
R1000
8500
4000
2500
10000
Aufprallfläche
Impact area
mind. Fallschutzplatten
min. required safety slabs
Fallschutzplatten
required safety slabs
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
ascendo 2A
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
Rev
Änderung
Datum
1:50
A3
Name
Name
Draufsicht
1028-00-00
Maßstab
Mattheis
03.05.17
a Mindestraum geändert
24.05.17 DB
SI
01.12.20
Aufprallfläche angepasst
B
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland