© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
Mounting instructions for springrider „altus2“
Item No. 51 3021 401
State: 29.09.2015 p. 2
Mounting instructions for springrider „altus2“
Diagram 2: Side view with dimension details „altus2“
1:10
1:10
Play level
Floor anchor
Concrete founda-
tion
1. Select the play equipment location in consideration of the required safety
area (see Diagram 3: 4600 x 3500 mm).
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
Regarding to DIN 1176 - 4.2.8.2.5, impact absorbing surfaces have to be put
under the whole impact area of every equipment with an enforced movement.
3. Carry out excavation work for the foundation anchor as shown in Diagram 2.
After excavation, compress the foundation floor.
Note:
The springrider is built in on the play level. Pay attention to items
marked „game level“ of play equipment!
4. Grout the foundation floor with concrete of quality class B25 up to a
height of appr. 150 mm.
Reinforcement plan:
Concrete foundation with rein-
forcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class B25
marking installation depth
500 Free fall height