Concrete foundation
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 3: Ø3400 mm).
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made
on the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundation as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The springrider is installed at play level.
4. Place the play equipment with foundation anchor as shown in diagram 2 in
the foundation hole.
5. Place the play equipment with foundation anchor into the concrete mass as
shown in diagram 2, so that the base plate is surrounded by a concrete thick-
ness of at least 50 mm both above and below.
6.
Pour the foundation floor with concrete to a height of appr. 100 mm.
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25
Play level
100
600
550
673
485
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Altus 1 Sattel
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:10
A3
Name
Name
Fundamentplan
0102-00-00
Maßstab
Mattheis
03.01.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
15.05.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
100
600
550
673
485
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Altus 1 Sattel
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:10
A3
Name
Name
Fundamentplan
0102-00-00
Maßstab
Mattheis
03.01.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
15.05.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
Diagram 2: Foundation plan
Foundation anchor