8 |
P a g e
STEP 2.0
WALL ASSEMBLY
2.0 - ASSEMBLY PARTS
–
WALL ASSEMBLY
PART CODE QTY
DESCRIPTION
FP
1
Front Wall panel
P
1
1200mm Wall panel
65HHS
3
65mm Hex head screw
-If optional window was purchased, it can take the place of any 1200mm (P) panel.
2.0 - ASSEMBLY
–
WALL ASSEMBLY
Screw through FP into P (top, centre & bottom) using 3 x 65HHS. (Holding studs flush on the
outside
)
Note: Ensure tongue on VJ cladding is facing upwards.
P
Screw 3 x 65HHS (Top,
centre & bottom)
FP
Cedar Strip
When screwing the four corners together please make sure the studs are flush on the
outside (not the inside) as per image below.
Содержание S3031
Страница 47: ...46 P a g e ...
Страница 50: ...49 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Страница 51: ...50 P a g e ...
Страница 52: ...51 P a g e ...
Страница 53: ...52 P a g e ...
Страница 54: ...53 P a g e ...
Страница 55: ...54 P a g e ...
Страница 56: ...55 P a g e ...
Страница 57: ...56 P a g e ...
Страница 58: ...57 P a g e ...