27 |
P a g e
STEP 4.5
DOUBLE DOOR INSTALLATION
4.5 - ASSEMBLY PARTS
–
DOUBLE DOOR INSTALLATION
PART CODE
QTY
DESCRIPTION
CD
2
Doors
HS
12
Hinge screw
4.5 - ASSEMBLY
–
DOUBLE DOOR INSTALLATION
Hold door in position, 3mm down from top. Front of the door when closed will be flush with
front of VJ cladding.
Screw through hinge into front wall (as pictured).
Repeat steps with other door.
Note: door centre gaps can be adjusted by unscrewing wall to floor fixing and moving in and
out.
Содержание S3005
Страница 36: ...35 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Страница 37: ...36 P a g e ...
Страница 38: ...37 P a g e ...
Страница 39: ...38 P a g e ...
Страница 40: ...39 P a g e ...
Страница 41: ...40 P a g e ...
Страница 43: ...42 P a g e ...