19 |
P a g e
STEP 3.1
DOOR HEAD ASSEMBLY
3.1 - ASSEMBLY PARTS
–
DOOR HEAD ASSEMBLY
PART CODE QTY
DESCRIPTION
1
Assembled front end 8ft Gable
DH
1
840x42x35mm Door Head (replace with 1440mm DH if DD)
DH
1
1440x42x35mm Door Head (ONLY IF DD OPTION PURCHASED)
65HHS
4
65mm Hex head screw
3.1 - ASSEMBLY
–
DOOR HEAD ASSEMBLY
Measure and mark middle of Door Head (DH)*. Lay Assembled front end Gable on a flat
surface with the frame facing upwards, as seen below. Line up middle mark on DH with
gable join centre, hold and screw down through gable into DH using 4x 65HHS- 2 either
side of gable join (as seen below).
* 420mm mark for SD / 720mm mark for DD.
Measure and mark middle of
Door Head
Screw through gable frame
into Door Head
Centre Door Head in
middle of Gable
Содержание Hyland S3015
Страница 43: ...42 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Страница 44: ...43 P a g e ...
Страница 45: ...44 P a g e ...
Страница 46: ...45 P a g e ...
Страница 47: ...46 P a g e ...
Страница 48: ...47 P a g e ...
Страница 49: ...48 P a g e ...
Страница 50: ...49 P a g e ...