5 |
P a g e
STEP 1.1
FLOOR FRAME INSTALLATION
The 16x8 floor frame comes in six parts. Install first floor frame in desired position at
desired height and fasten to logs once level and square, then join and fasten next frame
until all six are joined and secured to logs.
1.1
–
FLOOR FRAME INSTALLATION
PART CODE QTY
DESCRIPTION
L
12
Logs 750x100x100mm
100BS
48
100mm batten screws
65BS
42
65mm Batten Screws
200PB
12
200mm M12 Post Bolt
W
24
M12 Washers
1.1
–
FLOOR FRAME INSTALLATION
Repeat the steps below for each floor frame, joining the floor frames together as you go in
order displayed in diagram below.
1.
Lay out frame in desired position and mark holes to dig, as indicated on diagram
below (use shovel or marking paint).
2.
Dig and place logs in holes (using concrete if you wish).
3.
Fasten floor frame to logs at desired height, using 4x 100BS per log, ensuring frame is
level*.
4.
Butt next floor frame into last installed frame and join using 6x 65BS evenly spaced
along EP or SJ.
5.
Repeat process until all frames are joined.
* Fasten frame to logs when roughly level and then critique by hammering in or adding dirt
(or concrete) to corners until perfectly level at every post.
Once all frames are joined, predrill holes (using a 13mm drill bit) and bolt each log to the
floor frame in spots indicated with 200PB, using washers on both sides.
Содержание Hollydean S3094
Страница 46: ...45 P a g e ...
Страница 49: ...48 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Страница 50: ...49 P a g e ...
Страница 51: ...50 P a g e ...
Страница 52: ...51 P a g e ...
Страница 53: ...52 P a g e ...
Страница 54: ...53 P a g e ...
Страница 55: ...54 P a g e ...
Страница 56: ...55 P a g e ...
Страница 57: ...56 P a g e ...
Страница 58: ...57 P a g e ...