6
| WPF M
WWW.STIEBEL-ELTRON.COM
INSTALLATION
SAFETY
INSTALLATION
7. Safety
Only a qualified contractor should carry out installation, commis-
sioning, maintenance and repair of the appliance.
7.1 General safety instructions
We guarantee trouble-free operation and operational reliability
only if the original accessories and spare parts intended for the
appliance are used.
7.2 Regulations, standards and instructions
Note
Observe all applicable national and regional regulations
and instructions.
8. Appliance description
8.1 Mode of operation
Environmental energy is extracted by the heat exchanger on the
heat source side (evaporator). Any energy extracted is transferred,
together with the energy drawn by the compressor drive, to the
heating water by a heat exchanger on the heating water side
(condenser). Subject to the heat load, the heating water can be
heated to +60 °C. The DHW is heated via the internal indirect coil
inside the DHW cylinder.
8.2 Standard delivery
No other components are supplied with the appliance.
9. Preparations
9.1 General information
Note
The heat pump is designed for installation in interiors,
except in wet areas.
Never install the heat pump immediately below or adjacent to bed-
rooms. Insulate pipes through walls and ceilings against structure-
borne noise transmission.
The room in which the appliance is to be installed must meet the
following conditions:
- No risk from frost.
- Floor of load-bearing strength (for the equipment weight,
see specification).
- Horizontal, level and solid floor, as the equipment feet on the
heat pump are non-adjustable.
- For a quiet heat pump operation on floating screeds, recess
the screed and the anti-vibration insulation around the in-
stallation location of the heat pump.
1
4
3
2
26
�0
3�
01
�0
21
3
1 Concrete base
2 Impact sound insulation
3 Floating screed
4 Recess
- The room must not be subject to a risk of explosions arising
from dust, gases or vapours.
- The floor area of the installation room must be at least 3 m²,
and the room must provide a volume of at least 6 m³.
- When installing the heat pump in a boiler room together
with other heating equipment ensure, that the operation of
other heating equipment will not be impaired.
Содержание WPF 10 M
Страница 1: ...OPERATION AND INSTALLATION BRINE WATER HEAT PUMP WPF 10 M WPF 13 M WPF 16 M WPF 7 MS WPF 10 MS ...
Страница 17: ...ENGLISH WWW STIEBEL ELTRON COM WPF M 17 INSTALLATION Specification ...
Страница 31: ...ENGLISH WWW STIEBEL ELTRON COM WPF M 31 CONTENTS Specification ...
Страница 32: ...32 WPF M WWW STIEBEL ELTRON COM CONTENTS ...