![STIEBEL ELTRON SBP 1000 E Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/stiebel-eltron/sbp-1000-e/sbp-1000-e_operation-and-installation_1376873016.webp)
installation
coMMissioning
16
| sBp e | sBp e sol | sBp e cool
www.stiebel-eltron.com
7. Commissioning
7.1 commissioning
Commissioning must only be carried out by a heating
contractor.
»
Fill and vent the appliance.
»
Check the functions of the special accessories in accordance with
the operating and installation instructions supplied with them.
»
Check the function of the on-site safety valve.
7.2 Decommissioning
If the heating system is not in operation and the installation lo-
cation is not protected against frost, the appliance and connected
system must be emptied.
»
For draining the appliance, remove the thermal insulation
around the drain connector.