Install the strainer and gaskets (the tee is not included in the
standard delivery). Strainers are self-sealing.
Only WSH 10:
D
00000
77
13
3
f
f
Connect the sensor tap to the power supply unit. Connect up
the power supply unit.
11. Commissioning
f
f
Flush the pipeline.
f
f
Open the angle valve. Adjust the water to the required vol-
ume at the angle valve.
10 sec.
4 sec.
1x 2 Sec.
A
B
C
D
E
D
00000
77
11
9
f
f
Commission the sensor tap:
A Remove the label.
B Wave your hand within range of the sensor.
C Move your hand out of range of the sensor.
D Water runs for approx. 4 seconds.
E Wait another 10 seconds. The sensor tap is now ready for
operation.
12. Settings
If required, you can set a fixed temperature and a hot water stop
at the sensor tap.
12.1 Setting a fixed temperature
You can set a fixed temperature at the sensor tap.
A
B
C
2,5
D
00000
77
12
3
f
f
Set the selected temperature as fixed by removing the lever
for adjusting the temperature and replacing it with a dummy
cap.
12.2 Setting the hot water stop
The hot water range can be locked by adjusting the Allen screw.
A
B
C
2
2,5
2,5
D
00000
77
12
2
f
f
Limit the setting range for hot water by turning the Allen
screw clockwise or anti-clockwise:
„+“ = reduce the hot water setting range
„-“ = increase the hot water setting range