a
-5-
LH
Fr
UP
下面視
Fr
RH
UP
3mm
→
6mm
→
9.5
mm
//////////
LH
Fr
UP
////////
/////
////////////////////////
LH
Fr
UP
3
4
5
!
Advice
Drill
cloth adhesive tape
!
Advice
After drilling, remove the burrs around
the hole.
If rainwater is attached, wipe it dry with
a dry cloth.
Insufficient wiping and drying can cause
the product to come off.
!
Advice
( The RH side also performs the same work. )
2. Cleaninng/Degreasing
Spoiler assy-side
Masking tape
Masking tape
LH side
LH side
Bottom view Fr side
Bottom view Rr side
【
Enlarged view
a
】
Locator center
(3) Mark the center of the locator on the
underside of the Spoiler assy-side with a
needle.
(4) Make pilot holes at the marking positions in
the order of 3 mm and 6 mm, and finally
make a 9.5 mm hole.
(5) Insert the
②
wellnut into the 9.5 mm hole.
(6) Remove the masking tape.
(1) Clean, degreas, and dry the shaded area of
the Spoiler assy-side with a degreasing
agent.
During drilling, put a cloth adhesive tape
as a stopper around the drill blade about
5mm from its tip in order to prevent
damages to the
Spoiler assy-side
.
②
Wellnut
×
10
Clean with a waste cloth, etc.
5mm