13
Pos: 39 /Technische Dokumentation/Überschriften/Installation @ 0\mod_1377172987669_567.docx @ 591 @ 1 @
6 Insta
Pos: 40 /STG-BEIKIRCH Technische Dokumentation/Installation STG/MZ3/Installation @ 1\mod_1455716786308_5
The installatio
engineering a
The operatio
Proper fixing
Immediately
the checks a
Pos: 41 /STG-BEIKIRCH Technische Dokumentation/Installation STG/MZ3/Schaltschrank montieren MZ3 @ 1\mod
6.1 Ins
The modular
Wall instal
Fig.: 2 Removin
1 Hexag
►
Remove
►
Affix the
►
Install th
►
Connec
Pos: 42 /Technische Dokumentation/Seitenumbruch @ 0\mod_1375798861029_567.docx @ 572 @ @ 1
1
allation
_567.docx @ 14248 @ @ 1
on must only
as well as this
n-safe functio
of mechanica
after the insta
nd results doc
d_1455717281260_567.docx @ 14241 @ 2 @ 1
stalling the
control panel
lation
ng the switch ca
gon nut
e the mounting
e switch cabine
he mounting p
t the earth con
Article-
be carried out
s technical doc
ning of the pro
al components
allation, the ele
cumented.
e switch c
s are installed
binet mounting p
Caution
Installation
g plate from th
et in accordan
plate in the sw
nnection.
Note
The earth co
established.
-no.: 1342499
t by trained an
cumentation.
oduct is thus e
s must be chec
ectrical and m
abinet
d horizontally o
plate
on the ceiling
he switch cabi
nce with the fix
itch cabinet.
onnection betw
.
99549
nd expert elect
ensured.
cked.
echanical com
on the wall, or
2
is
NOT
permit
net.
xing holes with
ween the mou
Date: 0
tricians taking
mponents mus
r standing dep
Fixing holes
tted.
h suitable dow
unting plate an
03.11.2016
into account
st be checked
pending on the
s
wels and screw
nd the switch c
the recognise
for proper fun
e size.
ws.
cabinet housin
Version: 1.7
ed rules of
nctioning and
ng must be
7