stewmac.com
20
© 2018 StewMac
u
STEP 48
Install the 16μF capacitor
+ two jumpers
Connect the 16μF electrolytic cap
between eyelets 2 and 16, with the
negative lead through eyelet 2, which
connects to the ground bus estab-
lished in Step 43 .
Cut one 3" yellow jumper . Flip the
board over and add it to eyelet 16 .
Run the jumper to the front through
hole 15 and pull it tight .
Cut one 3" green jumper and wrap it
onto eyelet 2 .
u
STEP 49
Add three long jumpers
Cut one 8-1/2" yellow jumper . Put an
ink mark on each end of this jumper’s
insulation so that later you can tell it
apart from the other yellow jumpers .
On the back of the board, run the
jumper between through holes 4 and
23 . Pull at least 2-1/4" of this jumper
up through hole 4, and at least 2" up
through hole 23 .
Cut two 10" green jumpers and twist
them together . Twisting these wires
reduces unwanted hum and noise .
Run them behind the board and pull
them to the front through hole 1
and 15 . Leave 2-1/2" of lead coming
through hole 1 and about 3-1/2" at
hole 15 .
Now all the components and wires
are on the eyelet board . Take a break
to rest your eyes before making sure
you’ve followed each step correctly .
To find no mistakes at this stage is
surprising, and it’s much less work to
find them now than after soldering!
As you check your work, make sure all
the connections are tight .
12
13
14
15 16
17
18
19 20
21 22
23
24
25
26
2
1
3
4
5
6
7
8
9
10
11
16μf
12
13
14
15 16
17
18
19 20
21 22
23
24
25
26
2
1
3
4
5
6
7
8
9
10
11
.02
2
μ
f
8μf
8μf
16μf
.02
2
μ
f
+
25
μ
F
Содержание 57 MINI TWEED
Страница 34: ...stewmac com 32 2018 StewMac ...
Страница 36: ...stewmac com 34 2018 StewMac ...
Страница 38: ...stewmac com 36 2018 StewMac ...
Страница 39: ...stewmac com 37 2018 StewMac ...