2
GODZILLA LE / PREMIUM MANUAL 500-55T6-01
TABLE OF CONTENTS
1. Setup and Moving .........................................3
1.1 First-Time Setup Instructions ...................................
3
1.2 Adjustments Menu .................................................... 6
1.3 Transporting the Game .............................................
7
1.4 Maintenance .............................................................
8
1.5 Maintenance Kits ......................................................
8
1.6 Common Parts ..........................................................
8
2. SPIKE System and Node Guide ...................9
2.1 SPIKE System Overview ...........................................
9
2.2 Node Bus Cabling .....................................................
9
2.3 System Power ...........................................................
9
2.4 SPIKE Node Addresses ............................................
9
2.5 SPIKE Node Programming ..................................... 10
2.6 SPIKE System Terminology .................................... 10
2.7 Common SPIKE Node Boards ................................ 10
3. Light, Switch, and Driver Reference .........11
3.1 SPIKE Node Boards................................................ 11
3.2 Driver Reference ..................................................... 12
3.3 Switch Reference .................................................... 14
3.4 Light Reference ....................................................... 18
3.5 Motor Reference ..................................................... 21
4. Electronic Pinouts and Schematics ..........23
4.1 SPIKE-2 CPU Node 0 .............................................
23
4.2 Cabinet Node 1 .......................................................
27
4.3 Lower Playfield 48V Driver Pinout Node 8 ..............
28
4.4 Mid Upper Playfield 48V Driver Pinout Node 9 .......
29
4.5 Lower Right LED Board 8b ..................................... 30
4.6 3-RGB LED Board 8b1 ........................................... 30
4.7 Lower Left LED Board 8c........................................ 31
4.8 1-RGB 2-W LED Board 9a1 .................................... 31
4.9 4-W LED Board 9a2 ................................................ 31
4.10 Center LED Board 9a ..............................................
32
4.11 1-RGB 5-W LED Board 9b ......................................
32
4.12 SW & LED Board 9c ................................................
33
4.13 Stepper Motor Node Board ...................................
33
4.14 Trough Serial Opto Receiver 8a .............................. 34
4.15 Trough Serial Opto Transmitter ............................... 34
4.16 Outlane 3-W LED Board ......................................... 34
4.17 Main Power Supply ................................................. 34
4.18 Power Distribution Board ........................................ 35
4.19 Power Plug Wiring .................................................. 35
5. Parts Reference ..........................................36
5.1 Playfield Rubber Parts ............................................ 36
5.2 Rubber Size Chart .................................................. 36
5.3 Playfield Assemblies, Top .......................................
37
5.4 Playfield Assemblies, Bottom .................................
38
5.5 Backbox Parts ........................................................
39
5.6 Speaker Panel Parts ...............................................
39
5.7 Cabinet Parts .......................................................... 40
5.8 Ball Shooter Assembly ............................................ 41
5.9 Auto Launch Assembly ........................................... 41
5.10 Ball Trough Assembly ............................................. 42
5.11 Slingshot Assembly ................................................ 42
5.12 Flipper Assembly, Left ............................................ 43
5.13 Flipper Assembly, Right .......................................... 43
5.14 Pop Bumper Assembly ........................................... 44
5.15 Bottom Arch Assembly ........................................... 45
5.16 Eject VUK Assembly ............................................... 45
5.17 Plastic 07 Assembly ................................................ 46
5.18 Plastic 08 Assembly ................................................ 46
5.19 Plastic 10 Assembly ................................................ 46
5.20 Plastic 13 Assembly ................................................ 46
5.21 Plastic 14 Assembly ................................................ 47
5.22 Plastic 16 Assembly ................................................ 47
5.23 Plastic 19 Assembly ................................................ 47
5.24 Plastic 22 Assembly ................................................ 47
5.25 Plastic 25 Assembly ................................................ 48
5.26 Plastic 57 Assembly ................................................ 48
5.27 Plastic 64 Assembly ................................................ 48
5.28 Plastic 67 Assembly ................................................ 48
5.29 Plastic 70 Assembly ................................................ 49
5.30 Plastic 71 Assembly ................................................ 49
5.31 Plastic 77 Assembly ................................................ 50
5.32 Plastic 83 Assembly ................................................ 50
5.33 Plastic 84 Assembly ................................................ 50
5.34 Left Narrow Spinner Assembly ............................... 51
5.35 Left Wide Spinner Assembly ................................... 51
5.36 Rollunder Switch Assembly .................................... 51
5.37 Rollunder Gate Assembly ....................................... 51
5.38 Ball Guide 01 Assembly .......................................... 52
5.39 Ball Guide 02 Assembly .......................................... 52
5.40 Ball Guide 03 Assembly .......................................... 52
5.41 Ball Guide 05 Assembly .......................................... 52
5.42 Ball Guide 07 Assembly .......................................... 53
5.43 Ball Guide 12 Assembly .......................................... 53
5.44 Bridge Downpost Assembly ................................... 53
5.45 Bridge Frame Assembly.......................................... 54
5.46 Bridge Plunger Assembly ....................................... 54
5.47 Bridge Left Half Assembly ...................................... 54
5.48 Bridge Right Half Assembly .................................... 55
5.49 Collapsing Bridge Assembly ................................... 55
5.50 Mechagodzilla Assembly ........................................ 56
5.51 Roto 3-Bank Assembly ........................................... 56
5.52 Roto 3-Bank Carriage Assembly ............................ 57
5.53 Newton Magnet Assembly ...................................... 58
5.54 Left Ramp Assembly ............................................... 58
5.55 Center Building Assembly ...................................... 59
5.56 Load Ramp Assembly ............................................. 59
5.57 Right Building Assembly ......................................... 59
5.58 Right Ramp Assembly ............................................ 59
5.59 Building Lift Platform Assembly .............................. 60
5.60 Building Assembly .................................................. 60
5.61 Collapsing Building Assembly ................................ 61
5.62 Floor 1 Subassembly .............................................. 61
5.63 Floor 2 Subassembly .............................................. 61
5.64 Floor 3 Subassembly .............................................. 62
5.65 Floor 4 Subassembly .............................................. 62
5.66 Floor 5 Subassembly .............................................. 62
5.67 Lock Gate Subassembly ......................................... 62
5.68 Lift Platform Assembly ............................................ 63
5.69 Motor Guide Subassembly ..................................... 63
5.70 Backpanel VUK Assembly ...................................... 64
5.71 Backpanel VUK Kicker Assembly ........................... 64
5.72 Backpanel Assembly .............................................. 65
5.73 Collapsing Building Adjustment Procedure ............ 66
6. Specifications
.............................................68
6.1 Game Dimensions................................................... 68
6.2 Warranty .................................................................. 69
6.3 Warnings, Compliance, and Legal Notices ............. 69
6.4 Stern Pinball End User License Agreement ............ 70