background image

 

RIGID METAL PIPE AND CPVC PLASTIC PIPE 
INSTALLATION: 

 

1) Turn off cold water supply valve and drain the 

line to prevent spillage.  

2) Drill 3/16" hole at the desired location. To pre-

vent shock hazard, use a battery operated drill.  

3) Before installing saddle tapping valve, make 

sure piercing lance does not protrude beyond 
rubber gasket.  

4) Assemble saddle tapping valve on copper 

tubing.   

5) Turn saddle valve handle clockwise to close 

valve. With a wrench tighten nut/seal around 
valve stem.  

6) When you wish to open valve and supply cold 

water to the unit, turn valve handle counter 
clock wise.  

7) Connect one end of the tubing to the feed 

water valve using brass compression nut and 
plastic sleeve. 

 

NOTE: For basement installations the existing 
feed water tubing may have to be longer to 
reach feed valve. 

 

C. Pre-fill and Sanitize the Storage Tank

 

 
Pre-filling the tank is always recommended so there 
is pressure to check for leaks and several gallons 
of water to flush carbon post filter. Tanks are 
furnished with a special disinfectant and only 
require filling with water and 15 minutes of contact 
time to be completely sanitized. It is important to 
use a sanitizer when pre-filling tank so the solution 
can sanitize the tubing, fittings, and faucet at the 
time of installation and startup.  

 

1) Insert free end of feed water tubing into the 

fitting on the storage tank.  

2) Open feed water valve and tank valve and 

allow tank to fill (about 3 minutes).  

3) Turn off feed water valve, tank valve, remove 

tank from tubing and set tank aside (15 
minutes minimum).  

 
D. Install the Drain Connection

 

 

IMPORTANT:  Before starting this procedure, 
inspect the condition of the drain piping, especially 
in older homes where the traps and tailpieces can 
be deceptively thin and frail. If in poor condition, it is 
wise to inform the customer that the condition 
should be remedied.  

The drain saddle assembly is designed to fit around 
a standard 1-1/2" OD drain pipe.  

 

The drain saddle should always be installed above 
(before) the trap and on the vertical or horizontal 
tail piece. Never install the drain saddle close to the 
outlet of a garbage disposal or plugging of the RO 
drain line may occur.   

 

1)  Peel adhesive covering from the back of foam 

square gasket and line up with the hole in the 
saddle drain and apply. This gasket provides 
a leak proof seal on the drain stand pipe. 

2)  Position both halves of drain saddle at 

desired location on drain pipe. 

3)  Use bolts and nuts to clamp drain saddle onto 

drain pipe. Do not over tighten and make sure 
there is equal space between saddle halves 
on each side.  

4)  Carefully drill hole through threaded fitting of 

drain saddle (as shown in Photo 2) being 
careful not to drill through opposite side of 
drain pipe. 

5)  Insert drain tubing into compression nut and 

tighten onto drain saddle.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Содержание QCRO-50

Страница 1: ...1 QCRO Manual 180728 docx INSTALLATION MANUAL 12630 US 33 N Churubusco IN 46723 Ph 260 693 1972 Fax 260 693 0602 www sterlingwatertreatment com QCRO 50 QCRO 50 PUMP SRO 100 ...

Страница 2: ...ge Tank 9 D Install the Drain Connection 9 E Install the RO Membrane 10 F Make Initial Tubing Connections 10 G Install the R O Assembly and Storage Assembly 10 H Make Final Tubing Connections 10 I Install Ice Maker Hookup optional 10 J Start up the System 11 K Flush System of Preservative and Check Operation 11 SECTION V OPERATION MAINTENANCE 12 A Normal Operation 12 B Changing Filters 12 C For Sy...

Страница 3: ...t is designed to reduce the dissolved mineral content of the water Minerals picked up in the environment by the water are measured as Total Dissolved Solids T D S In the reverse osmosis process dissolved minerals are separated from the incoming water feed water to produce the product water permeate The excess minerals are rinsed to drain reject water The spiral wound construction of the R O membra...

Страница 4: ...pending upon the scaling and fouling tendencies of the feed water Actual production is typically 50 of the membrane rating and TDS reduction level 75 or better depending upon the supply water quality pH temperature pressure TABLE B RECOMMENDED OPERATING LIMITS FOR FEED WATER Specifications T F C Membrane Water Pressure 40 100 psig 280 690 kPa TDS 800 1 800 ppm also mg l max non pump pump model Tem...

Страница 5: ...the customer s preference If a basement installation is selected additional tubing hardware and fittings may be needed and a hole will have to be made from inside the cabinet through the floor to the basement Never install in an area of the home where temperature is freezing as damage to the system will result Considerations for an ice maker or other remote hook up should be determined including r...

Страница 6: ...net base with screws or double sided tape The feed water supply must pass through the Leak Stop Valve Should a leak occur and the underside of the Leak Stop Valve gets moist the feed water will be terminated Once activated the Leak Stop Valve can be reset one time D Prepare the Area for Installation To save time it is often advised to call the customer and request they clear under the sink prior t...

Страница 7: ...the chassis punch per instructions and tighten nut to cut the desired hole size d Clean up sharp edges with a file if necessary PORCELAIN ENAMEL CERAMIC ON SHEET METAL OR CAST IRON BASE Recommended tools Variable speed drill Relton porcelain cutter tool set 7 8 size alternate 9 16 size may be used for non air gap faucet Plumber s putty It is important to understand what is involved in this procedu...

Страница 8: ... nipple until it seats Thread the compression nut onto the nipple and tighten securely If using the quick connect faucet fitting 6FC4 instead discard the compression nut plastic ferrule and tube insert Thread the quick connect fitting securely onto the threaded nipple and firmly insert the 3 8 tubing into the quick connect fitting B Install the Feed Water Valve and Tubing The saddle tapping valve ...

Страница 9: ...t free end of feed water tubing into the fitting on the storage tank 2 Open feed water valve and tank valve and allow tank to fill about 3 minutes 3 Turn off feed water valve tank valve remove tank from tubing and set tank aside 15 minutes minimum D Install the Drain Connection IMPORTANT Before starting this procedure inspect the condition of the drain piping especially in older homes where the tr...

Страница 10: ...dewall with the mounting screws The tank may be oriented either vertically or horizontally It is generally placed to the rear of the cabinet but can be set in the front center between the sink basins for ease of access if space permits H Make Final Tubing Connections With all of the components in place the final tubing connections can be made When routing tubing between components several guidelin...

Страница 11: ...connecting tubing at drain connection and measure as per above The ratio should be a minimum of 2 5 reject to 1 product 3 Close faucet and re inspect system for leaks Instruct customer to wait at least 4 hours and drain tank again The water should be discarded as it may contain some preservative disinfectant chemicals 4 System should be ready to use as soon as the tank refills If any objectionable...

Страница 12: ...ST BE REPLACED AT REGULAR INTERVALS TO MAINTAIN PROPER PERFORMANCE USE ONLY FACTORY APPROVED FILTERS Please see Page 3 for the recommended interval for changing the filters Local conditions may dictate more frequent changes Use a drip pan to catch any water that may spill when the filter housings are removed 1 Close plastic supply valve located on the inlet line of the system 2 Close the valve on ...

Страница 13: ...13 To fix a leak Relieve pressure Release tubing Cut off at least from end Reattach tubing Confirm connection is leak free TO ATTACH TUBING TO RELEASE TUBING ...

Страница 14: ...Holding Tank Valve is closed Open valve No drain flow the Drain Restrictor or drain line is plugged Clear or replace drain restrictor and or drain line The Check Valve is stuck Clear or replace check valve The ASO valve Auto Shutoff valve is malfunctioning Replace ASO valve Low pressure at the Dispensing Faucet Air pre charge in the storage tank is too low Empty water from storage tank and with th...

Страница 15: ...alve New post filter or activated carbon pre filter not rinsed completely Flush with two full tanks of product water The feed water TDS has increased An increase in feed water TDS will give a corresponding increase in product water TDS Tastes and odors in the Product Water The post filter or activated carbon pre filter is exhausted Replace filters There is foreign matter or bacteria in the R O sys...

Страница 16: ...16 1 2 4 5 6 7 8 9 10 DRAIN SUPPLY 11 12 13 3 3 3 14 3 15 16 17 18 QCRO 50 Component Parts Breakdown 19 20 14 21 3a ...

Страница 17: ...0201 Membrane Housing with Cap Universal less membrane 12 RO TFC50 Universal R O Membrane 50 GPD 13 RO CVQC Check Valve for RO System Quick Connect 14 4MC Male Connector 1 4 tube x 1 4 NPT 15 F SAD Supply Saddle Valve 1 4 Thread 16 QCF S Quick Change Filter Sediment 17 QCF GAC Quick Change Filter Granular Activated Carbon 18 QCF CB Quick Change Filter Carbon Block 19 BV 101 Ball Valve 1 4 tube x 1...

Страница 18: ...18 QCRO 50 PUMP Component Parts Breakdown 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 3 3a 3 3 3 15 3 4a 22 ...

Страница 19: ...embrane 50 GPD 11 PJ V6005 G Pump 24v with transformer 12 SOLE 1 Inlet Solenoid Valve QC Normally Closed 13 RO FR14 1 4 QC Flow Restrictor 350 ML 14 HPS 1 High Pressure Switch Quick Connect 15 4MC Male Connector 1 4 tube x 1 4 NPT 16 LPS 1 Low Pressure Shut Off Switch Quick Connect 17 QCF CB Quick Change Filter Carbon Block 18 QCF GAC Quick Change Filter Granular Activated Carbon 19 QCF S Quick Ch...

Страница 20: ...20 SRO 100 Component Parts Breakdown 1 2 7 6 3 21 13 10 9 5 3 8 3a 3 3 11 12 15 17 18 19 4 20 3 14 15 16 4a 3 22 ...

Страница 21: ...ane 100 GPD 11 PJ V100 G Pump 24v for 100 GPD RO System 12 SOLE 1 Inlet Solenoid Valve QC Normally Closed 13 RO FR14 900 1 4 QC Flow Restrictor 900 ML 14 HPS 1 High Pressure Switch Quick Connect 15 4MC Male Connector 1 4 tube x 1 4 NPT 16 LPS 1 Low Pressure Shut Off Switch Quick Connect 17 QCF CB Quick Change Filter Carbon Block 18 QCF GAC Quick Change Filter Granular Activated Carbon 19 QCF S Qui...

Страница 22: ...move the expanded pellet from the retainer 3 Replace the expanded pellet with the spare compressed pellet 4 Seat the compressed pellet and retainer into the lower body 5 Push the upper cover down until it snaps securely in place Leak Stop Valve Compressed Pellet Replacement ...

Страница 23: ...nty Not Cover This warranty does not cover the disposable sediment and carbon filters whose service life depends on feed water conditions In addition the membrane is only warranted if the required feed water conditions are met The above warranty will also not apply to any part of the R O Drinking Water System that is damaged because of neglect misuse alterations accident misapplication physical da...

Отзывы: