3-9
Installation Instructions
Uncrating/Installation Instructions
P-920010-163
b.Brown wire (L1) to L1 on TB1.
c.Blue wire (N) to L2/N on TB1.
d.Black wire (L3) to L3 on TB1.
NOTE: The black wire is not used. Be sure that it is properly insulated
in the junction box.
•
For 400 V, three phase, 50 Hz units:
a.Green/yellow wire (ground) to ground terminal.
b.Brown wire (L1) to L1 on TB1.
c.Black wire (L2) to L2 on TB1.
d.Black wire (L3) to L3 on TB1.
e.Blue wire to terminal identified X on TB1.
NOTE: The blue wire (neutral) is not used. Be sure that it is properly
insulated in the junction box.
3. Connect main supply cord to building electrical supply box.
Secure main supply cord with a strain relief (not by STERIS).
4. Re-install access panel on contactor box.
Содержание RELIANCE 200
Страница 1: ...UNCRATING INSTALLATION INSTRUCTIONS RELIANCE 200 250 GLASSWAREWASHER 01 30 02 P 920010 163 Rev 1 ...
Страница 6: ...iv P 920010 163 Uncrating InstallationInstructions Introduction This page intentionally left blank ...
Страница 46: ...4 2 P 920010 163 Uncrating Installation Instructions Installation Checklist This page intentionally left blank ...
Страница 54: ...5 8 P 920010 163 Uncrating Installation Instructions Operational Test This page intentionally left blank ...