3-1
Installation Instructions
Uncrating/Installation Instructions
P-920010-163
Permissible Environmental Conditions
This equipment is designed to give optimal results in an environ-
ment where maximum relative humidity is 80 percent for temperatures
up to 88°F (31°C), decreasing linearly to 50 percent relative humidity
at 104°F (40°C).
Noise Level
Equivalent Sound Pressure Level at work station (measured 36"
[1,000 mm] away from equipment and at 63" (1,600 mm) from
ground: 65.6. dB(A). (Results determined according to
ISO-3746:
1979 Standard: Acoustic Determination of Sound Power Levels of
Noise Sources Survey Method).
Amperage and Power Consumption
Maximum current and power consumption:
• 208 V~, 23.1 A, 6.7 kW, 3
φ
, 60 Hz
• 230 V~, 27.9 A, 6.42 kW, 1
φ
, 50/60 Hz
• 400 V~, 12.1 A, 6.5 kW, 3
φ
, 50 Hz
• 460 V~, 10.1 A, 6.7 kW, 3
φ
, 60 Hz
Seismic Anchorage System (optional)
A Seismic Anchorage System is available for high-risk seismic
zones.
An Equipment Drawing, showing all utility and space requirements,
was sent to you after the order for this equipment was received. The
clearance space, specified on the Equipment Drawing is necessary
for proper installation, operation, and maintenance of the unit. If this
document is missing or misplaced, contact your STERIS represen-
tative, giving the serial, equipment, and model number of the unit.
A replacement copy will be sent promptly.
NOTE: No ventilation is required if equipment is installed according
to equipment drawings and follows installation instructions in this
manual.
NOTE: For CE requirements, see next page.
1. Clearance - Clearance space shown on Equipment Drawing is
necessary for easy installation and proper operation and main-
tenance of equipment.
2. Utility service lines:
• Utility service requirements are shown on the Equipment
Drawing.
• To allow service on unit without shutting off building supply
lines, shutoff valves (not by STERIS) should be installed on
water lines to unit. Shutoff valves must be capable of being
locked in
OFF
position only.
INSTALLATION INSTRUCTIONS
3
Installation
Requirements
1234567890123456789012345678901212345
1234567890123456789012345678901212345
12345678901234567890123456789012123456
12345678901234567890123456789012123456
Technical Specifications
1234567890123456789012345678901212345
1234567890123456789012345678901212345
1234567890123456789012345678901212345
1234567890123456789012345678901212345
Содержание RELIANCE 200
Страница 1: ...UNCRATING INSTALLATION INSTRUCTIONS RELIANCE 200 250 GLASSWAREWASHER 01 30 02 P 920010 163 Rev 1 ...
Страница 6: ...iv P 920010 163 Uncrating InstallationInstructions Introduction This page intentionally left blank ...
Страница 46: ...4 2 P 920010 163 Uncrating Installation Instructions Installation Checklist This page intentionally left blank ...
Страница 54: ...5 8 P 920010 163 Uncrating Installation Instructions Operational Test This page intentionally left blank ...